







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinets & Countertops in Richardson, TX
Cabinet and countertop replacement in Richardson typically runs $6,200 to $19,500 depending on door style, stone selection, and whether you keep the existing layout. It’s the highest-impact change you can make to a kitchen: new doors and slabs reset the whole room, fix storage that stopped working years ago, and give you a surface you can actually chop on without apology. Groundwork Construction Co. of Richardson handles cabinets and countertops as part of the broader Kitchen Remodeling in Richardson service, which means the trades are sequenced correctly instead of stacked on top of each other in the wrong order. Call (833) 954-4985 and a live person answers, day or night.
Most of the kitchens we walk into in Richardson were built between 1972 and 1996. That matters. Cabinets from that window were often framed with particleboard boxes and stapled drawer bottoms, and the countertop is usually a square-edge laminate glued to a plywood deck. By the time a homeowner calls us, the laminate is lifting near the sink, a drawer or two won’t track, and someone has already painted the cabinets once as a stopgap. We replace what’s failing and keep what’s worth keeping.
You get upfront pricing with no surprises, a written scope before the first cabinet comes off the wall, and the 730-Day Done Right Promise behind every installation. If a door hangs wrong in month fourteen, we come back and fix it. That’s the whole idea.
Key Takeaways
- Cabinet and countertop replacement in Richardson generally lands between $6,200 and $19,500 for a standard-size kitchen.
- Cabinet boxes are usually salvageable in houses built after the mid-1980s; the doors, drawers, and countertop rarely are.
- Quartz is now the default choice in Richardson, and Cambria’s stock slabs move faster here than most national averages suggest.
- Template-to-install on countertops runs 5 to 10 business days; cabinet installation typically runs 2 to 4 days.
- Our technicians have up to 12 years of experience, they’re background-checked, and they arrive in uniform.

When You Need Cabinets & Countertops
There’s a difference between a kitchen that looks tired and one that has actually failed. These are the situations Richardson homeowners call us about most often.
- Your countertop has a seam that’s given up. In Richardson’s older ranch homes, laminate and even some early solid-surface counters were seamed right at the sink cutout. Twenty years of water exposure softens that seam, and the edge starts to curl. Once a seam lifts, water reaches the substrate and the damage is running underneath your sightline.
- Drawer boxes are splitting at the joints. Particleboard boxes from the 1980s and early 1990s swell when they absorb humidity. North Texas swings from humid spring to bone-dry summer to humid again, and those cycles work staples and glue loose. If two or more drawers in your kitchen have failed, the rest aren’t far behind.
- You’re planning to sell within a few years. Kitchen updates in this part of the Dallas metro area move the needle more than almost any other project. Buyers walk into a Richardson kitchen and immediately judge the counters and cabinet fronts. It’s the first thing they touch.
- The cabinet layout fights your daily routine. A 1980s kitchen in the Prairie Creek area might have a peninsula that blocks the work triangle, or a dishwasher door that hits the oven handle. Replacing cabinets gives you a chance to fix the layout without touching the room’s footprint.
- The countertop can’t take the heat. If you’ve scorched a laminate counter more than once, or the laminate is delaminating around the range, that surface is done. Quartz and granite handle direct heat contact better, though neither is invincible.
- You want to change the countertop material without gutting the room. Cabinet doors and drawer fronts can be swapped while the boxes stay, and a new slab goes on top. That’s a smaller job with a faster turnaround and a lower price tag.
If your project is bigger than this, say a wall coming out or a full reconfiguration, that’s a job for our home remodeling team rather than a cabinets-only scope. We’ll tell you which one you’re actually looking at after we walk the kitchen.
Our Cabinets & Countertops Process
This is the sequence we run. Every step gets scheduled before the job starts, so you know who’s coming and when.
- Free in-home estimate and design consult. We measure the kitchen, check the cabinet boxes for square and see whether the walls are plumb. We sit down with you and pick door styles, finishes, slab materials, and edge profiles. We’ll pull samples from our brand partners, so you’re choosing KraftMaid doors and Cambria slabs in person, not from a website swatch. You leave with a written scope and a firm price.
- Order materials and lock the schedule. Cabinets and slabs both have lead times, and the slab has to be reserved. We handle the ordering and give you a start date before we leave your home. Upfront pricing, no surprises: the number on the estimate is the number you pay unless you change the scope.
- Demo and prep. Old countertops come out, cabinet doors and fronts come off, and we protect the floors and adjacent rooms. Our technicians are background-checked and in uniform on every job. Demo typically runs one day for a standard Richardson kitchen.
- Cabinet installation. Boxes get set, leveled, and shimmed so doors close flush. We’re careful about Richardsons’s older walls here, because few of them are straight. Base and wall runs get scribed to the actual wall, not to a straight line that doesn’t exist. Cabinet installation runs 2 to 4 days.
- Countertop template and install. The counter template happens after the cabinets are set. That sequence matters: template first, cut second, install third. Quartz installs usually land 5 to 10 business days after template, depending on the fabrication queue. We schedule around the slab shop, not the other way around.
- Backsplash, hardware, and final walkthrough. Tile goes in, handles and pulls go on, and we caulk the seams and corners properly. You walk the kitchen with us before we pack up. Anything on your punch list gets addressed. Then the 730-Day Done Right Promise goes into effect.
One thing we won’t do is give a firm countertop install date before the cabinets are set and measured. Anyone who promises you both dates on day one is guessing.

Cabinets & Countertops Pricing in Richardson
These are real ranges for a Richardson kitchen in the 10-by-12 to 12-by-15 range. Your actual number depends on door style, slab selection, and whether we’re replacing boxes or only doors and fronts.
| Item | Typical Range | Notes |
|---|---|---|
| Cabinet boxes only (replacing all) | $3,900 – $9,800 | Depends on stock vs. semi-custom, linear footage, and door count |
| Cabinet refacing (doors, fronts, and drawer boxes) | $2,400 – $5,600 | Boxes stay; fronts and boxes get a new face |
| Quartz countertop (installed) | $2,800 – $5,400 | Cambria and comparable slabs; sized to a standard kitchen |
| Granite countertop (installed) | $2,100 – $4,200 | Slab price varies by import availability |
| Laminate countertop (installed) | $900 – $1,900 | Lowest upfront cost; shortest lifespan |
| New backsplash tile | $700 – $1,900 | Subway to full-height mosaics |
| Undermount sink and faucet install | $400 – $950 | Cutout coordination with the countertop fabricator |
| Full cabinets and countertops together | $6,200 – $19,500 | The realistic all-in range for most Richardson jobs |
What moves the number
Slab selection. A standard quartz slab and a rare-bookmatched Cambria slab can differ by $1,800 in the same kitchen. Nothing you can do changes the cost of the slab except choosing a different one. We’ll show you both ends of the range and tell you what we’d pick if it were our own kitchen.
Cabinet door style and finish. Flat-panel doors cost less than raised-panel, and glazed finishes cost more than solid stains. KraftMaid’s semi-custom line gives you real range here. If you want the look without the full cabinet spend, refacing is a genuine option, not a sales pitch.
Sink and appliance coordination. A new undermount sink needs a cutout in the slab, and that cutout happens at the fab shop, not on site. If you’re changing appliances mid-project, tell us early. Last-minute sink swaps cost more than planned changes do.
Who does the plumbing and electrical work. Moving a dishwasher line or adding an outlet to the island means a licensed trade. We coordinate that. That’s what “from foundation to finish line” means in practice.
Financing helps. We offer 0% financing for 18 months, and $1,000 off projects over $10,000. For a cabinets and countertops job in Richardson, most homeowners qualify for the discount without any extra negotiation.
If you’re comparing a cabinets-only job to a full kitchen remodel, our Kitchen Remodeling page lays out what gets folded into a larger scope, so you can see the difference before you commit to either path.
FAQs – Cabinets & Countertops
How much do new cabinets and countertops cost in Richardson?
New cabinets and countertops in Richardson run $6,200 to $19,500 all-in for a standard kitchen, with refacing-and-countertop jobs starting around $3,300 to $7,500. The single biggest variable is whether you replace the boxes or keep them. Call (833) 954-4985 for a free estimate and design consult; it’s an exact quote, not a ballpark.
Can I replace just the countertop and keep my cabinets?
Yes, and in many Richardson homes that’s the smarter move. If the cabinet boxes are solid, square, and still track properly, a countertop-only job gets you the biggest visual change with the least time and money. We check the boxes during the estimate and give you a straight answer on whether they’re worth keeping. Then we template after install and you’re typically cooking again within two weeks.
How long does cabinet and countertop replacement take in Richardson?
A typical cabinets and countertops project in Richardson takes 2 to 4 weeks from start to final walkthrough, with cabinet installation running 2 to 4 days and countertops landing 5 to 10 business days after template. The longest stretch is usually material lead time, not labor. We’ll give you a start date and a finish date before demo begins, and we’ll tell you immediately if a slab order slips.
Is it cheaper to reface cabinets or replace them?
Refacing is cheaper, and in most cases it runs $2,400 to $5,600 compared with $3,900 to $9,800 for new boxes. But refacing only makes sense if the boxes are sound and the layout works. If drawers are splitting or the peninsula is in the wrong place, refacing is money spent on a cabinet that will fail in two years. Call (833) 954-4985 and we’ll tell you which path your kitchen needs, based on what we see, not on what’s easiest to sell.
Every job is backed by the 730-Day Done Right Promise. If it’s not done right, we make it right.
Why Richardson Homeowners Choose Groundwork Construction Co.
We work in Richardson, and we know the housing stock. Older ranch homes in the Arapaho corridor have walls that were rarely plumb to begin with. Kitchens in the Heights neighborhood often run tight, and the cabinet layout has to respect a load-bearing wall you can’t move. We plan for that at the estimate instead of discovering it during demo.
Every project comes with the same set of commitments:
- Upfront pricing, no surprises. The estimate is the price. Changes cost more only if you change the scope.
- Live person, 24/7. A real human answers the phone, any hour. No voicemail black holes.
- Background-checked, uniformed technicians. Our techs are vetted and they show up looking like professionals.
- 730-Day Done Right Promise. Two full years of coverage on the work we do. One of the longest workmanship guarantees in residential construction.
- Trusted brand partners. KraftMaid cabinets, Cambria countertops, Kohler fixtures, and dozens more across our other service lines.
We also handle the trades that touch a cabinets and countertops job. That means you don’t call your own plumber, find your own electrician, and coordinate the schedule yourself. One contractor, one point of contact, one number to call. If you’re also planning a bathroom or a new home addition in Richardson, we can fold it into the same schedule.
Wondering what a larger scope looks like? Our guide to kitchen remodeling in Garland walks through the same decision points we cover on a full Richardson kitchen. And if you’re planning a project in a neighboring city, our kitchen remodeling in Plano page covers that market’s specific housing stock.
Our brand partners aren’t a sales list, they’re the products we’ve tested in this climate and this housing stock. Kitchen remodeling in McKinney has its own set of considerations, and so does kitchen remodeling in Frisco. Different neighborhoods, different problem sets. We’ll tell you which considerations apply to your kitchen.
The place to start is the free estimate. We measure, we check the boxes, we design with you, and you get a written scope and a firm price. Call (833) 954-4985 and a live person will answer.
Written by the team at Groundwork Construction Co. of Richardson, serving Richardson.


