A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Richardson, TX

New Detached ADU in Richardson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Richardson, TX actually involves

A new detached ADU in Richardson, TX typically runs $45,000 – $130,000 and takes four to seven months from survey to final inspection, depending on size and whether utilities have to be trenched from the main house. That number covers a standalone structure on your existing lot: foundation, framing, roof, electrical, plumbing, HVAC, insulation, and finishes. Call (833) 954-4985 and we’ll walk your lot and give you a written, line-item estimate before you commit to anything.

Call (833) 954-4985

How we build a New Detached ADU, stage by stage

A remodeled family room with new windows and a window seat

Every detached ADU we build in Richardson follows the same sequence, and the sequence matters because each stage locks in decisions the next one depends on. Here’s what actually happens, and when.

Stage 1: Site survey and feasibility (week 1)

Before anyone draws a thing, we survey the lot. On Richardson’s older platted blocks, lot coverage and setback rules are the first thing that make or break a detached ADU, so we measure your existing footprint against what the city allows. You decide the rough size and where the structure sits. This is also when we flag whether your alley access, side yard, or driveway can carry equipment and concrete trucks without tearing up a fence.

Stage 2: Design, engineering, and permits (weeks 2 – 8)

Once the footprint is set, we produce the drawings and structural engineering and submit for permits. On a detached ADU this stage is the schedule’s wild card: Richardson’s infill posture means plan review and demolition inspection are routine parts of the job here, and how fast your permit moves depends on how complete the submission is the first time. You decide the floor plan and exterior finish package in this window, because those choices go into the permit set.

Stage 3: Site prep, foundation, and utilities (weeks 6 – 10)

After permit issuance we clear the footprint, set the forms, and pour the foundation. If the ADU needs a separate electrical service, gas line, or sewer tie-in, the trenching and inspections happen here. Richardson’s expansive clay soils are the reason we don’t shortcut foundation prep; a slab on poorly compacted clay will move, and a detached structure has no big house to hide behind. You’ll see the foundation inspection before framing starts.

Stage 4: Framing, roof, and rough-in trades (weeks 10 – 18)

Framing, sheathing, and roofing go up in one flow, then electrical, plumbing, and HVAC rough-in follow with their own inspections. This is the stage where North Texas weather dictates the calendar: framing and dry-in get squeezed into spring and fall around summer heat and winter ice, so we build float into the schedule rather than promise a date the weather can break.

Stage 5: Insulation, finishes, and final inspection (weeks 18 – 28)

Insulation, drywall, cabinetry, flooring, fixtures, and paint close it out, followed by the final inspection and a walkthrough with you. You’ll make your finish selections back in Stage 2 so nothing sits idle waiting on a cabinet decision. The whole project is covered by our 730-Day Done Right Promise once we hand over the keys.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between for a detached ADU

Most of the budget swings in a New Detached ADU come from four decisions. Here’s the honest trade-off on each.

  • Size and configuration: A studio or one-bedroom ADU lands near the low end of the $45,000 – $130,000 range; a two-bedroom with a full kitchen, laundry, and a covered porch pushes toward the top. Build the size you can rent or house family in, not the biggest footprint the lot allows.
  • Exterior cladding: James Hardie fiber cement holds up to North Texas hail and sun and holds paint far longer than wood siding, at a modest premium. Brick veneer matches the ranch homes around you and adds cost and lead time. Vinyl is cheapest and shows its age fastest.
  • Cabinetry and finishes: KraftMaid or Wellborn cabinets in the ADU kitchen and a Cambria or quartz counter give you a durable, rentable finish. Builder-grade stock cabinets save real money but read as temporary to a tenant or appraiser.
  • Utilities and mechanicals: Tying into the main house’s electrical service is cheaper than a separate meter if your panel has capacity. A separate service costs more upfront but makes the ADU truly independent for rental or family use. Same logic applies to HVAC: a dedicated mini-split system beats extending the house ductwork.

What a New Detached ADU costs in Richardson, TX

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for a detached ADU here, with the median completed project landing around $80,000 – $95,000 for a one-bedroom with a full kitchen and bath. Five variables push a job from the bottom of that range to the top:

  • Square footage: the single biggest lever. Every additional 200 square feet adds roughly $18,000 – $28,000 in foundation, framing, roofing, and finishes.
  • Utility runs: trenching a sewer, water, gas, and electrical line across a long yard adds $6,000 – $15,000; a structure sited close to the main house saves most of that.
  • Foundation conditions: older Richardson lots with clay movement or a slope may need over-excavation or piers, adding $3,000 – $10,000.
  • Material grade: fiber cement and quality cabinetry versus builder-grade moves the finish package by $8,000 – $20,000.
  • Permit scope and site work: driveway, walkway, and grading to drain water away from both structures can add $4,000 – $12,000.

A written estimate from us itemizes foundation, framing, roofing, each trade, and the allowance for finishes, so you see where every dollar lands. What it won’t include unless we itemize it: landscaping beyond grading, furniture, and any site work tied to a future project. Upfront pricing, no surprises.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richardson homes specifically do to this job

Richardson’s construction market runs on two parallel realities, and both touch an ADU build. The mature 1950s – 60s ranch core around Richardson Heights sits on pier-and-beam foundations and narrow original lots, where lot-coverage and setback rules mean fitting a detached structure in the backyard takes a real survey before anyone draws. The massive Telecom Corridor footprint at CityLine and Palisades keeps the city’s inspection and permitting pipeline busy year-round, so a complete, well-prepared permit submission is what keeps your ADU moving instead of sitting in review. The clay soils and spring hail that drive foundation piering and post-storm roof replacements across Richardson shape how we detail a detached structure too: a proper slab, drainage away from both buildings, and hail-rated roofing. If your ADU project is part of a full Home Additions & ADU in Richardson plan, we scope both together so the site work isn’t done twice.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Richardson

A new concrete driveway with a paver border

Get a free estimate for your New Detached ADU in Richardson

We’ll come out, walk your lot, check setbacks and utility routes, and give you a written, line-item estimate for a New Detached ADU in Richardson with no obligation. Call (833) 954-4985 to schedule. On that call we’ll ask about your lot, your target size, and how you plan to use the ADU, then set a time to walk the property. Homeowners often pair this with Concrete Driveways & Concrete Work in Richardson or Paver Driveways in Richardson once the site plan takes shape. We also handle the wider scope through our Home Additions & ADU service across Richardson.

Written by the team at Groundwork Construction Co.

Why Richardson Chooses Groundwork Construction Co. of Richardson

We set the standard for new detached ADU in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardware

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(833) 954-4985

Request a Free Estimate in Richardson

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch