A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows

ADU Construction Cost in Richardson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does ADU Construction Cost in Richardson?

ADU construction in Richardson typically runs $90,000 to $220,000 for a complete, permitted unit, with most detached one-bedroom builds landing between $130,000 and $175,000. A garage conversion sits at the low end of that plane at $30,000 to $80,000, while a full two-bedroom detached ADU with a kitchen and full bath pushes toward the top. The number you pay depends on size, foundation type, utility runs, and finish level, and we put all of it in writing before a single permit is pulled.

We’re Groundwork Construction Co. of Richardson, and we build ADUs from foundation to finish line under one contract. No-hassle upfront pricing means the number you see is the number you pay, and every ADU we complete is covered by our 730-Day Done Right Promise. Call (833) 954-4985 for a free estimate and design consult.

A remodeled family room with new windows and a window seat

ADU Construction Cost Breakdown (2026)

Here’s how the money splits across a typical Richardson ADU project. These are installed ranges, not allowances, and they reflect what we see on bids across the Dallas County side of the metro.

Line Item Typical Range
Detached ADU construction (full scope) $90,000 – $220,000
Garage conversion to living space $30,000 – $80,000
Attached addition / in-law suite $45,000 – $130,000
Site prep, grading and slab or pier foundation $8,000 – $28,000
Utility trenching and new meter (water, sewer, electric, gas) $6,000 – $22,000
Framing, sheathing and roof system $18,000 – $42,000
Windows, exterior doors and siding $6,000 – $18,000
Electrical rough-in and finish $5,000 – $14,000
Plumbing rough-in and fixtures $5,000 – $16,000
HVAC system and ductwork $5,000 – $12,000
Insulation and drywall $4,000 – $12,000
Kitchenette (cabinets, countertop, appliances) $4,000 – $13,000
Bathroom (full bath, tile, vanity) $9,000 – $28,000
Flooring and interior paint $3,500 – $11,000
Permits, engineering and city fees $3,000 – $12,000

What pushes these numbers up or down in Richardson comes down to three things. Detached builds cost more than garage conversions because you’re paying for a brand-new foundation, roof, and separate utility service. A slab-on-grade build is cheaper than a pier-and-beam setup, which matters here because the black clay soils across Richardson and nearby Plano move with the seasons. And finish level is the biggest lever of all: painted drywall and builder-grade flooring reads very different on a bid than custom tile, a full kitchen, and Andersen or Marvin windows.

Detached ADU vs. Garage Conversion Pricing

A detached ADU is the premium option because it’s a fully separate structure with its own foundation, roof, HVAC, and address. Expect the full $90,000 to $220,000 range. A garage conversion is the budget play at $30,000 to $80,000 because the shell and slab already exist; you’re mostly paying for insulation, utilities, a full bath, and finishes. If your lot has room and you want the most flexibility for rental income or multigenerational living, the detached build usually earns it back. If you want the fastest path to an extra bedroom with a working kitchen, the conversion wins on cost.

Finish Level and What It Costs

On a 600-square-foot ADU, choosing a full kitchenette over a simple wet bar adds roughly $4,000 to $13,000. A walk-in tiled shower instead of a standard tub-shower pushes the bathroom line from the low end of $9,000 toward $12,000 and up. Upgraded impact-rated windows matter in this part of Texas – we regularly spec them on ADUs near the Bush Turnpike corridor where summer hail is a real concern – and they add $800 to $25,000 depending on count and glass package. We pull from our curated brand partners so you’re choosing quality, not just what’s in stock that week.

What Affects ADU Construction Pricing in Richardson

Richardson has its own set of cost drivers that don’t show up on a generic national ADU calculator. Here’s what actually moves the number on your property.

  • Lot size and setbacks. Richardson lots vary a lot between the older neighborhoods near downtown and the newer subdivisions out toward Renner Road. A tight side yard forces a smaller footprint or a two-story design, and structural complexity costs more than square footage.
  • Utility runs. Tapping a new water and sewer line can add $6,000 to $22,000 depending on distance from the main and whether the city requires a new meter. On corner lots the runs are shorter; on deep lots they’re longer.
  • Foundation type. The expansive clay soil under Richardson means we often spec pier-and-beam or a post-tension slab to keep the ADU stable through wet and dry cycles. That foundation decision alone can swing $8,000 to $28,000.
  • Permitting and zoning review. The City of Richardson requires ADU approval through its development services process, and fees plus engineering run $3,000 to $12,000 on a typical project. We handle the paperwork, but the cost is real and baked into your bid.
  • Alley access and staging. Properties with alley access make it easier to stage materials and pour concrete, which trims labor. Homes on busy arterials where we need traffic control or off-hours deliveries cost more.
  • Finish and systems choices. HVAC sizing, insulation values, and window packages all stack up. Sealed attic systems and high-efficiency HVAC add upfront cost but keep the unit comfortable through a Richardson August.
A framer checking new wall framing on a home addition

How to Save on ADU Construction in Richardson

There are real ways to bring an ADU budget down without cutting corners that cost you later. These are the moves we walk clients through on the estimate.

  • Start with the shell you have. If you already own a detached garage, a conversion at $30,000 to $80,000 is far cheaper than a new build at $90,000 to $220,000. We’ll tell you honestly whether your garage is a good candidate before you commit.
  • Design to standard dimensions. Rooms sized to standard lumber lengths and stock cabinet widths reduce waste and labor. Custom everything is where budgets quietly inflate.
  • Keep utilities close. Positioning the ADU near existing water, sewer, and electrical service can shave the utility trenching line significantly. This is a site-planning decision, so raise it early.
  • Choose durable over fancy. Tile and luxury vinyl plank hold up in a rental unit and cost less than exotic hardwoods. Our brand partners include James Hardie siding and Kohler fixtures, which balance quality and price.
  • Bundle with other work. If you’re also planning a Richardson service area project like a kitchen or bath refresh, combining scopes spreads mobilization costs and can trigger our $1,000 off projects over $10,000 offer.
  • Use the financing. We offer 0% financing for 18 months, which spreads the build out without interest and lets you keep cash reserves for landscaping or furnishing the unit.

The best savings come from a straight answer up front. Our estimates are free, the pricing is upfront with no surprises, and a live person answers the phone 24/7 – no voicemail black hole. Call (833) 954-4985 and we’ll get a real number on paper.

What a Realistic 2026 ADU Budget Looks Like

For a 600-square-foot detached one-bedroom ADU in Richardson with a compact kitchenette, a full bath, and a mid-grade finish, plan on roughly $140,000 to $165,000 all-in including permits. A 400-square-foot studio conversion of an existing garage typically lands between $45,000 and $65,000. A two-story 900-square-foot detached unit with two bedrooms and upgraded windows will run $185,000 to $220,000. These ranges are not specials; they’re what the work actually costs when it’s permitted and inspected. Every project is covered by our 730-Day Done Right Promise, so if something isn’t done right, we make it right.

Why Call Us Before You Sign a Bid

Most ADU bids in Richardson are either a single lump-sum number with no breakdown or a list of allowances that balloons the moment you pick a real countertop. We show you the line items you see in the table above so you can compare apples to apples. Our technicians have up to 12 years of experience, they show up background-checked and in uniform, and they answer questions directly. A project this size deserves a contractor you can trust from first call to final walkthrough.

FAQs – ADU Construction Cost

How much does a 600-square-foot ADU cost in Richardson in 2026?

A 600-square-foot detached ADU in Richardson typically costs $130,000 to $175,000 fully built and permitted, including kitchenette, full bath, and site work. Garage conversions of the same footprint run $45,000 to $70,000 because the shell and slab already exist. Call (833) 954-4985 for an exact quote on your lot – estimates are free.

Is it cheaper to convert a garage or build a detached ADU in Richardson?

Garage conversion is the cheaper route, generally $30,000 to $80,000 versus $90,000 to $220,000 for a new detached structure. The savings come from reusing the existing foundation and roof. Detached builds cost more but allow more square footage and a separate address for rental income. Call (833) 954-4985 and we’ll tell you which path fits your lot.

What permits and fees should I expect for an ADU in Richardson?

Plan on $3,000 to $12,000 for permits, engineering, and city review fees on a typical Richardson ADU. Your exact number depends on the unit size and whether a lot survey is needed. We handle the permit package and inspections as part of the contract, so you’re not chasing the city yourself. Call (833) 954-4985 to talk through the process.

Can I finance ADU construction in Richardson, and does it help?

Yes – we offer 0% financing for 18 months, plus $1,000 off projects over $10,000, which applies to any ADU build. On a $150,000 project that interest-free window keeps more cash in your pocket during and after construction. Call (833) 954-4985 to see what your monthly payment looks like.

How long does ADU construction take in Richardson?

A garage conversion usually takes 8 to 12 weeks, and a detached ADU generally runs 16 to 24 weeks from permit approval to final inspection. Weather, inspection scheduling, and utility connections are the usual causes of slip. We’ll give you a written schedule up front and keep you updated. Call (833) 954-4985 for a free estimate and design consult.

Why should I pick Groundwork Construction Co. for an ADU in Richardson?

Because the pricing is transparent, the warranty is in writing for 730 days, and a live person answers the phone 24/7. We build from foundation to finish line under one contract, using brand partners like James Hardie, GAF, and Kohler so quality isn’t left to chance. Our technicians arrive background-checked and in uniform. Call (833) 954-4985 and get a real number on paper.

Get a Real ADU Number for Your Richardson Lot

ADU pricing in Richardson isn’t a mystery when you have a contractor willing to put the line items in writing. Whether you’re converting a garage for an aging parent, building a detached rental unit out back, or adding an in-law suite off the main house, we’ll walk your property, talk through the site constraints, and hand you a clear estimate with no surprises. Our team brings up to 12 years of technician experience to every job, and the 730-Day Done Right Promise backs the work long after the punch list is closed. Explore more of what we do on our home page, then call (833) 954-4985 for a free estimate and design consult. Live person, 24/7.

Pricing reflects the Richardson market as of 2026. Groundwork Construction Co. of Richardson offers free estimates – call (833) 954-4985.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

- Marco Castillo

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

- Keisha Robinson

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

- Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawer

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Richardson? Licensed & insured · free written estimates
Call (833) 954-4985

Request a Free Estimate

Tell us what's going on in Richardson. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch