







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterBathroom Remodel Cost in Richardson, TX: What Your 1960s Plumbing Is Really Hiding
A bathroom remodel in Richardson typically costs between $9,000 and $28,000, and the spread that wide comes almost entirely from what’s inside the walls, not what’s on the tile floor. A cosmetic refresh in a sound 1960s ranch home can land near the low end. A gut-to-studs rebuild that replaces a failing cast-iron drain stack and galvanized supply lines runs toward the top. We’re Groundwork Construction Co. of Richardson, and we price these honestly from day one so there are no surprises at demo. Call (833) 954-4985 for a free estimate and design consult, answered by a live person 24/7.
Here’s the scene we walk into more than any other in this city. A homeowner budgets $14,000 for a master bath. Demo day opens the wall and there it is: a corroded cast-iron stack, a rotted subfloor joist, and galvanized supply lines that haven’t been touched since the Johnson administration. The project closes at $24,000. That surprise wasn’t bad luck. It was predictable, and a real pre-demo inspection would have caught it before the first tile came up.

Why Richardson Bathroom Costs Are a Plumbing Story First
The housing stock here tells the story. Much of the original Richardson Heights plat and the dense post-war blocks near Central Expressway were built between the 1950s and 1970s, single-story brick ranches on pier-and-beam foundations. That means a bathroom added in 1965 was built with materials that were standard then and are now at the end of their service life. Cast-iron drain stacks that have quietly rusted from the inside. Galvanized supply lines that have narrowed to a trickle. Shower pans set in mortar over a lead pan (or worse, no waterproofing membrane at all) that have been leaking a little at a time into the subfloor for forty years.
None of that shows up in a “before” photo. All of it changes your budget. Tile choice moves the number by hundreds. Plumbing rough-in and subfloor repair move it by thousands.
Pre-Demo Inspection Checklist for a 1950s-70s Richardson Bathroom
Before you sign a remodel contract in Richardson, this is what any contractor worth hiring should be checking on a bathroom of this era. Ask your contractor to walk through it with you and put the findings in the proposal.
- Drain stack condition. Cast-iron versus PVC matters. Cast iron cracks, scales, and fails at the hubs. We run a camera or open an inspection point before quoting a gut remodel.
- Supply line pressure and corrosion. Galvanized lines clog over decades. If the shower pressure is weak everywhere, it’s the pipes, not the showerhead.
- Subfloor moisture. Original shower pans set without a modern waterproofing membrane are the top cause of subfloor rot on pier-and-beam. We probe for soft joists and check for staining from the subfloor up.
- Exhaust fan venting. A fan that dumps into the attic or a joist bay does nothing. It moistens the framing instead. Venting to the exterior is a code requirement and a moisture requirement.
- Framing and stud bay layout. Narrow original bays and plumbing stub-outs that were placed in 1968 constrain where a new shower niche or floating vanity can actually go.
That last point is where homeowners get surprised by scope. A floating vanity needs wall-mounted plumbing rough-in and blocking at a precise height; if the original supply stubs are coming up through the floor, that’s a plumbing relocation, not a style upgrade. A shower niche needs clear space in the stud bay that isn’t already occupied by a vent stack or a joist. On a newer home this is a design decision. In a 1960s Richardson bath, it’s often a rough-in decision with a dollar sign attached. This is also why a walk-in shower conversion or tub-to-shower swap costs what it does; we cover the full scope in our Bathroom Remodeling page.

Bathroom Remodel Cost Tiers for Richardson
Three genuinely different projects, three genuinely different price bands. Treat them as separate conversations.
| Project Type | What It Covers | Installed Range |
|---|---|---|
| Cosmetic Refresh | New tile, vanity, fixtures, paint on sound plumbing | $9,000-$14,000 |
| Gut-to-Studs Rebuild | Plumbing rough-in replacement, subfloor repair, tile, fixtures | $16,000-$24,000 |
| Full Reconfiguration | Layout change, plumbing relocation, structural work on pier-and-beam | $24,000-$28,000 |
Individual line items we quote in Richardson
| Item | Range |
|---|---|
| Bathroom Vanity Installation | $800-$3,000 |
| Walk-In Shower Installation | $4,500-$12,000 |
| Tub-to-Shower Conversion | $3,500-$10,000 |
| Shower Replacement | $3,000-$8,500 |
| Small Bathroom Remodel | $5,000-$12,000 |
Where does the money go on an older Richardson bath? Plumbing rough-in and subfloor repair typically absorb $4,000 to $8,000 of the total when the original stack and supply lines are failing. Tile and fixtures are the visible spend. The hidden spend is what keeps your bathroom from failing again in five years.
What a 730-Day Done Right Promise Actually Covers in a Bathroom
Bathroom defects are moisture defects, and they show up long after the contractor has packed up. That’s why our 730-Day Done Right Promise matters most here. If it’s not done right, we make it right, and we back it in writing for two full years, which is one of the longest workmanship guarantees in residential construction.
Specifically, it covers the failure points that matter:
- Waterproofing membrane behind tile. The layer you’ll never see until it fails. We install it to spec and stand behind it.
- Caulk joints at the tub-to-wall transition. The number-one leak point on a remodeled bath.
- Exhaust fan performance. Moving air to the exterior, not into the attic.
We work in premium material brands with real warranties, Kohler for fixtures and Moen for valve cartridges. But the promise is about the installation, not the box.
Why Uniformed, Background-Checked Crews Matter in Your Bathroom
A bathroom remodel takes days, sometimes weeks, and the crew is inside the most private room in your home. You’re not just hiring a tile setter; you’re letting people into your daily routine. Every Groundwork Construction Co. of Richardson technician is background-checked and arrives in uniform. No one shows up in an unmarked van, no one is a stranger you met once at the bid. Our technicians have up to 12 years of experience, and the same people who walk your job are the ones who finish it. On Richardson’s older platted blocks, where narrow lots and lot-coverage rules can complicate even a modest project, having a crew that knows the terrain matters.
How to Budget for a Richardson Bathroom Remodel
Start with a firm range from an inspection, not from a magazine photo. Then price the scope tiers before you price the fixtures. A cosmetic refresh on sound plumbing in Richardson runs $9,000 to $14,000. A gut rebuild with plumbing replacement runs $16,000 to $24,000. A layout change on pier-and-beam lands at $24,000 to $28,000. If the total crosses $10,000, our standing $1,000 Off Projects Over $10,000 promotion applies. Pair it with 0% financing for 18 months and a free estimate and design consult, and the upfront price you see is the price you pay. No hidden permits line, no surprise framing charge.
FAQs
A bathroom remodel in Richardson runs $9,000 to $28,000, with most gut-to-studs projects landing between $16,000 and $24,000 once original plumbing is replaced. The low end is a cosmetic refresh; the high end is a full reconfiguration. Call (833) 954-4985 for an exact quote. Estimates are free.
Older Richardson bathrooms cost more because much of the 1950s-70s housing stock still has cast-iron drain stacks, galvanized supply lines, and shower pans without modern waterproofing. Those items add $4,000 to $8,000 to a typical remodel. A pre-demo inspection catches them before you sign. Call (833) 954-4985 to schedule one.
Replacement almost always wins for a cast-iron stack that’s actively corroding; spot repairs buy months, not years. If you’re already gutting the bathroom, replacing the stack during the remodel is the cost-effective move. Call (833) 954-4985 and we’ll walk you through it.
Yes, we can often schedule a same-day or next-day estimate, and our phones are answered by a live person 24/7. Call (833) 954-4985 and we’ll get you on the calendar, no voicemail, no waiting until Monday.
Planning a bathroom remodel in Richardson and want a real number instead of a guess? Call Groundwork Construction Co. of Richardson at (833) 954-4985 for a free estimate and design consult. We’ll inspect before we quote, price it upfront, and back the work with our 730-Day Done Right Promise. Live person, 24/7.
Written by the team at Groundwork Construction Co. of Richardson, serving Richardson, TX.
What Our Customers Say
"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."
- Craig Whitaker












