A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Richardson, TX

Garage Conversion ADU in Richardson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Richardson, TX: What It Takes and What It Costs

A garage conversion ADU in Richardson runs $45,000 – $130,000 for most projects. Converting an existing attached garage into a legal, permitted living unit usually takes 10 – 16 weeks from demo to final inspection. This isn’t a quick coat of paint and a mini-split. It’s a real permitted dwelling with its own kitchenette, bath, insulation, and separate entrance. To scope yours, call (833) 954-4985 and we’ll set up a free on-site estimate.

Call (833) 954-4985

Richardson is an odd market for this work. The original ranch-home core, much of it in the old Richardson Heights plat, has detached garages and oversized shops sitting on generous lots. That’s a different animal than converting a tight two-car garage in Plano. Those detached structures are already standing, already wired, and sometimes already 24 feet deep. The question becomes whether the shell is worth saving and what the city will let you attach to it. That judgment call is where an experienced contractor earns their keep.

Key Takeaways

  • Most Richardson garage conversions land in the $45,000 – $130,000 range.
  • Realistic timeline: 10 – 16 weeks, with permit review adding 4 – 8 weeks upfront.
  • Detached shops convert differently than attached garages, and Richardson has plenty of both.
  • Every conversion needs kitchenette, bath, insulation, egress, and inspection sign-off.
  • The 730-Day Done Right Promise covers the workmanship for two full years.

How a Garage Conversion ADU Gets Built in Richardson, Step by Step

A finished backyard cottage with a small covered porch

The sequence matters. Skip a stage and a Richardson inspector will send you back. Here’s the actual order we run.

Stage 1: Walkthrough and plan (week 1 – 2). We measure the structure, check the slab or pier-and-beam condition, trace the electrical panel capacity, and confirm where the sewer line sits. This is when you decide unit size, entry door location, and whether you keep or replace the existing slab. We also pull the survey because Richardson’s lot coverage and setback rules on those narrow original lots bite every conversion project.

Stage 2: Permits and engineering (week 2 – 8). Plans get drawn, then submitted. Richardson’s permitting department sees infill and remodeling jobs constantly, and they know what a legal ADU needs: separate address, egress windows, smoke and CO detectors, insulation to current code, and a documented kitchenette. This stage is the slowest and sits outside our control. You’ll need to budget the review time into your schedule.

Stage 3: Demo and rough-in (week 8 – 10). The garage door comes off, framing gets opened, and plumbing and electrical get run to the new locations. If the existing slab or pier-and-beam needs foundation work, this is when we discover it. You decide slab finish versus a new subfloor and where the wet wall lands during this stage. Choose wrong here and the whole layout suffers.

Stage 4: Insulation, drywall, and systems (week 10 – 14). Spray foam or batt insulation goes in (foam costs more but swallows the North Texas heat), drywall goes up, and HVAC, plumbing fixtures, and electrical devices get installed. This is the swing stage for finishes: flooring, cabinets, countertops, fixtures. You’re choosing between mid-grade and premium here, and every line is quoted upfront with no surprises.

Stage 5: Final inspection and punch list (week 14 – 16). Richardson’s inspector signs off on framing, electrical, plumbing, and final. We walk the unit with you, fix the punch items, and hand over the finished space. The 730-Day Done Right Promise starts the day we finish.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Richardson Garage Conversion ADU

The variables that matter most belong to you, not to us. Here’s what each one costs you in real terms.

  • Slab or pier-and-beam. Existing concrete slab is cheaper and faster to work with. A pier-and-beam structure on those older Richardson properties needs foundation moisture handling and can add cost, but the floor feels warmer and plumbing runs underneath without cutting concrete. On 1950s – 60s Richardson stock, you’ll see both.
  • Insulation grade. Batt insulation is the budget standard. Closed-cell spray foam costs more upfront but handles the summer heat and stabilizes indoor humidity far better. For a unit you’ll rent or house family in, foam usually pays back.
  • Kitchenette configuration. A sink, cooktop, and under-counter fridge is the legal minimum most Richardson plans pass. Adding a full range, dishwasher, and vent hood raises the electrical load and the permit scope. Decide before drawings go out; changing mid-build means a change order.
  • Bathroom layout. Wet walls should line up with existing plumbing where possible. Moving the stack costs real money. A walk-in shower runs cheaper than a tub and suits the unit better for long-term use.
  • Windows and doors. Impact-rated or high-performance units matter here. Boral and Tamko carry decent lines for exterior trim profiles, and PGT and CGI both make windows rated for North Texas wind and hail. Good glazing costs more and holds up better through spring storms.

What a Garage Conversion ADU Costs in Richardson, TX

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 depending on shell condition, finishes, and whether plumbing has to move. The low end is a straightforward attached two-car garage with existing slab and utilities nearby. The high end is a detached oversized shop that needs foundation work, new HVAC, new electrical service, and premium finishes throughout.

The five variables that push a job toward the high end:

  • Existing shell condition. A poorly built shop needs reframing or re-roofing before it can be a legal dwelling. Roof replacement alone with GAF or CertainTeed products runs into thousands.
  • Utilities distance. The farther the garage sits from the main house’s electrical, plumbing, and HVAC, the more trenching and line work.
  • Permit scope. A legal separate address with a second electrical meter and utility connections costs more to permit than a simple attached room.
  • Finish grade. Counters, cabinets, flooring, and fixtures move the number more than structure does. Mid-grade lands around $60,000 – $85,000; premium pushes toward the top.
  • New HVAC versus extending existing. A dedicated mini-split is often cheaper and easier on a detached shop. Extending a ducted system can cost more and delivers less control.

Written estimates we issue are line-item and fixed. They include demo, framing, rough and finish plumbing, electrical, HVAC, insulation, drywall, flooring, fixtures, and final inspection coordination. What’s not included: city permit fees (paid directly to Richardson), any hazardous material remediation, and structural repairs discovered once walls open up. Every project over $10,000 gets $1,000 off, and 0% financing for 18 months is available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richardson Homes Do to a Garage Conversion ADU

Richardson’s build era is the single biggest X-factor on these jobs. The city’s core is 1950s – 70s single-story brick ranches, many on pier-and-beam foundations, sitting on narrow platted lots in original subdivisions like Richardson Heights. Expansive clay soils mean foundations need piering and moisture control, and any conversion we do on a pier-and-beam garage starts with a foundation inspection. On those older blocks, the lot coverage and setback rules mean even a modest conversion can bump up against what the city allows, so we pull the survey before we draw plans.

Then there’s the parallel reality here: the Telecom Corridor and the CityLine and Palisades footprint generate a steady stream of remodel, addition, and full-scrape rebuild work on those same small lots. Richardson’s redevelopment posture means permits and demolition inspection are daily business for the city’s building department, which is actually good news. They know these plans when they see them. We’ve learned to build foundation moisture control and hail-rated materials into every conversion because the North Texas spring storms don’t care what month you finish. Fencing often gets paired with the conversion if the new entrance faces an alley, which is where fence installation in Richardson usually comes up. And homeowners planning to add a gate or path for the ADU entrance frequently pair this with Concrete Driveways & Concrete Work in Richardson.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions: Garage Conversion ADU in Richardson

New double-hung windows in a dining room

Get Your Garage Conversion ADU Priced for Your Richardson Property

A free on-site estimate is the right first step. We’ll walk your garage, check the shell and foundation, confirm where utilities sit, and put a line-item number in front of you with the permit scope spelled out. A live person answers when you call (833) 954-4985, day or night, and we’ll book the walkthrough around your schedule. No pressure, no vague bids, just a real number for a real unit.

Written by the team at Groundwork Construction Co.

Why Richardson Chooses Groundwork Construction Co. of Richardson

We set the standard for garage conversion ADU in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(833) 954-4985

Request a Free Estimate in Richardson

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch