







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub to Shower Conversion Cost in Richardson, TX
A tub-to-shower conversion in Richardson runs $3,500-$10,000 for the work itself, and $9,000-$28,000 when you’re folding it into a fuller bathroom remodel. Most homeowners land in the $5,500-$9,000 range for a custom tile shower inside the existing tub footprint. Reach us at (833) 954-4985 and we’ll give you a straight number after we see your drain location and foundation. Upfront pricing, no surprises.

Why Your Richardson Drain Location Changes the Price
If your Richardson home was built on a slab before 1975, the drain your new shower needs may not be where your old tub drain is. Moving a drain in a slab house means breaking concrete, and that job is not in the $1,500 conversion quote you saw advertised online.
This is the cost variable almost no price guide mentions. A tub and a shower don’t share a drain position. The tub drains at one end; a shower pan drains at its center. In an alcove conversion where you keep the plumbing wall intact, that difference is often absorbed with a slight offset. When the new shower footprint shifts the drain more than a few inches, plumbing code requires a proper re-route, and re-routing through a concrete slab means saw-cutting the floor, trenching to the new position, running the PVC to correct fall, and pouring back. That adds $800-$2,500 to any conversion quote. It’s not a line item a contractor can design around, and it’s not negotiable with the plumbing inspector.
Many of Richardson’s single-story ranch homes in the older plats sit on pier-and-beam foundations, though. There, the opposite is true. Drain re-routing happens underneath the floor, between the joists, without breaking concrete. Conversions in those homes come in cheaper and go faster, often with the rough-in done in a day instead of two or three.
The good news: we identify foundation type and drain position during the initial site visit. You know which scenario you’re in before any number is agreed upon. If you’re weighing a conversion against a wider scope, our Bathroom Remodeling guide walks through how the pieces fit together.
What a Tub-to-Shower Conversion Costs in Richardson
Here’s how the numbers actually break down by scope, calibrated to the Richardson market. These are the same ranges we quote on site, not teaser pricing:
| Conversion Scope | Typical Cost Range |
|---|---|
| Basic alcove conversion with prefab shower base (acrylic or fiberglass) | $2,200-$4,500 |
| Custom tile conversion within the existing tub footprint | $5,500-$9,000 |
| Conversion requiring drain relocation on slab | $7,500-$12,000+ |
| Walk-in shower installation (frameless glass, bench, tile) | $4,500-$12,000 |
| Full bathroom remodel (conversion plus vanity, flooring, lighting) | $9,000-$28,000 |
| Small bathroom remodel (half-bath or tight footprint) | $5,000-$12,000 |
What moves you up or down inside those ranges:
- Shower pan type. A prefab acrylic base keeps you near the bottom. A mud-set tile pan with a curbless entry needs a linear drain and skilled waterproofing, and that’s where the labor climbs.
- Waterproofing method. A bonded membrane or a foam-board system with pre-formed corners costs more in materials than a cement board and paint-on approach. It’s also the difference between a shower that lasts and one that leaks. We don’t skip it.
- Glass and trim. Frameless tempered glass, a bench, and finished niche work add $1,200-$3,000 depending on size and custom cuts.
- Tile selection. Large-format porcelain runs fewer cuts. Mosaic floors and herringbone walls run more hours, and hours are what you’re paying for.
- Hidden damage. An older tub surround sometimes conceals rotted studs or water damage behind the original wall. We open the wall and show you before we add a penny to the scope.
Groundwork Construction Co. of Richardson quotes these jobs with brand partners like Kohler for fixtures and trim, plus our curated tile and membrane suppliers, so you’re choosing quality you can see, not just what’s in stock. And every conversion is covered by our 730-Day Done Right Promise. If it’s not done right, we make it right.

What Budget Tub-to-Shower Jobs Get Wrong
The most common failure in a cheap conversion is water intrusion behind the shower base, and it usually shows up within the first year. A contractor who slaps tile over old backer board, or skips the pre-slope under the pan, leaves a gap where water works its way down behind the wall. Richardson’s expansive clay soils make it worse: your foundation moves with the seasonal moisture swings in North Texas, and that movement opens seams at the base of the shower. North Texas heat also cures poor thinset and cheap membranes fast, and spring storms that hammer the area mean a leak you didn’t notice in February can be staining the ceiling below by April.
That’s why our conversion work focuses on the parts you’ll never see. Proper slope under the pan, a continuous waterproof membrane tied into the drain flange, and a flood test before the tile goes down. It’s also why the 730-Day Done Right Promise covers waterproofing integrity. Water behind the base is a workmanship problem, and if it happens, we fix it.
How Long Does a Tub-to-Shower Conversion Take in Richardson?
Most conversions take five to ten working days in a pier-and-beam Richardson home and seven to twelve on a slab where the drain has to move. The difference is the concrete work: saw-cut, trench, re-route, patch, and cure before the pan goes back in. A prefab conversion can wrap in three or four days once the drain is set. Tile work, drying time between coats, and the flood test are what stretch the calendar.
Richmond’s construction market runs in two lanes, from mature 1950s-60s ranch remodels to the modern Telecom Corridor buildouts, so permits and inspections are an everyday part of the job here. We handle the plumbing permit and inspection on your behalf, and we don’t start demo until the paperwork is clear.
Frequently Asked Questions
A basic prefab alcove conversion in Richardson runs $2,200-$4,500, a custom tile conversion within the existing footprint runs $5,500-$9,000, and a conversion that needs the drain relocated on a slab runs $7,500-$12,000 or more. Bundled into a wider bath remodel, expect $9,000-$28,000. Call (833) 954-4985 for an exact quote; estimates are free.
Converting to a low-threshold or walk-in shower is usually the better value long term, even though a tub resurface costs less upfront. A resurface won’t fix a failing drain or a leaking valve, and accessibility matters as homeowners in Richardson age in place. For a straight cost comparison on your specific bathroom, call us for a free estimate at (833) 954-4985.
Yes. A conversion that adds or moves a drain, changes the shower valve, or relocates plumbing requires a plumbing permit and inspection in Richardson. Cosmetic-only tile replacements sometimes fall outside that, but any conversion touching the drain or supply lines needs one. We pull the permit and coordinate the inspection. Call (833) 954-4985 to talk through your project.
Yes, and we do it as part of the free estimate. We poke into the foundation type and trace the existing drain position during the site visit so you know which cost tier you’re in before signing. A live person answers our line around the clock at (833) 954-4985.
Get a Real Number for Your Richardson Conversion
Stop guessing at a drain location you can’t see. Schedule a free, no-pressure estimate and we’ll measure your foundation, trace the drain, and hand you an upfront price with nothing buried. All work backed by the 730-Day Done Right Promise. Financing available at 0% for 18 months. Call (833) 954-4985 today.
Written by the team at Groundwork Construction Co. of Richardson, serving Richardson, TX.
What Our Customers Say
"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."
- Marco Castillo"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."
- Craig Whitaker












