A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Allen, TX

Garage Conversion ADU in Allen - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Allen, TX: What It Costs and How It Works

A garage conversion ADU in Allen, TX typically runs $45,000 – $130,000 and takes three to five months from permit to final inspection. You’re trading a three-car storage bay for a finished living space with its own entry, bath, and kitchenette: roughly 400 to 650 square feet of conditioned floor area. Call (833) 954-4985 to schedule a free on-site estimate and get a written, line-item number before anyone swings a hammer.

Call (833) 954-4985

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Most Allen conversions follow the same arc. The order matters, because a slab you pour before the plumbing rough-in is a slab you break back open.

Stage 1 – Walkthrough and feasibility (week 1)

We measure the existing garage, check slab elevation against the house, and look at where the electrical panel sits and whether it has room for the added load. You decide the floor plan here: studio versus one-bedroom, where the bathroom lands. This is also when we check your HOA’s architectural rules, since Allen subdivisions built in the 1990s and 2000s almost always require written HOA approval before the city will even look at your permit.

Stage 2 – Design and permitting (weeks 2 through 6)

Plans get drawn, then submitted to the City of Allen for building, electrical, plumbing, and mechanical permits. Review timelines shift with the city’s workload, so we build buffer into the schedule rather than promise a date we can’t hold. You sign off on the final plan set and the material selections before anything is ordered.

Stage 3 – Demo and rough-in (weeks 7 through 10)

The garage door comes off and the opening gets framed and closed. Slab work begins: trenching for the bathroom drain line, cutting and pouring for the new shower and toilet rough-in. Electrical gets run for outlets, lighting, and the mini-split. Rough framing for the new interior walls goes up. The city inspects the rough-in before any drywall goes on, and we don’t cover a wall until that inspection passes.

Stage 4 – Insulation, drywall, and finishes (weeks 11 through 16)

Spray foam or batt insulation goes in the walls and ceiling, then drywall, texture, paint, flooring, cabinetry, and fixtures. This is the longest stretch and the one where your finish choices show up in the final number. You’ll pick flooring, cabinet fronts, countertop material, and fixtures during stage 2 so nothing stalls here.

Stage 5 – Final inspections and turnover (weeks 17 through 20)

The city signs off on final building, electrical, plumbing, and mechanical. We walk the space with you, fix the punch list, and hand over warranty paperwork. Our technicians have up to 12 years of experience on conversions like this, and every job is backed by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a Garage Conversion ADU

The bones of the conversion stay similar. Where the price and the feel of the space diverge is in these decisions:

  • Heating and cooling: a ductless mini-split is the standard pick for an Allen conversion, because running ductwork from the main house rarely pencils out. It costs more up front than a window unit and far less to run. If you want the ADU on the house’s central system, expect added ductwork and a load calculation.
  • Flooring: luxury vinyl plank handles a slab-on-grade space and the humidity swings of North Texas without the swelling risk of solid hardwood. Tile in the bath is non-negotiable. Carpet is cheaper but shows wear fast in a rental.
  • Kitchenette: a full range needs a 240-volt circuit. A two-burner cooktop, sink, and under-counter fridge keep it simpler and cheaper. KraftMaid and Wellborn both make compact cabinet lines that fit a 6-foot run without custom pricing.
  • Exterior cladding: the old garage opening needs a real wall, and James Hardie fiber cement siding is what we recommend for Allen’s hail seasons. It takes impact better than vinyl and holds paint longer.
  • Windows and door: the new entry door and any added windows should carry a wind rating that satisfies the city’s wind-load requirements. This is where a cheap bid and a good bid often part ways.

What a Garage Conversion ADU Costs in Allen, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a garage conversion ADU in Allen. Where you land in that band comes down to five things:

  • Size and layout: a single-bay conversion with one bath sits near the bottom. A three-car garage split into a bedroom, full bath, and kitchenette pushes toward the top.
  • Plumbing distance: the farther the new bath sits from the house’s existing drain stack, the more slab gets cut. Moving the bathroom to a corner saves money; putting it across the garage adds it.
  • Electrical load: a garage with an unused sub-panel is easy. A full panel that needs an upgrade adds cost you won’t see in a cheap quote.
  • Finish grade: builder-grade vinyl and laminate versus tile, quartz, and custom cabinetry can swing $20,000 or more on the same footprint.
  • Permit scope: adding a full kitchen with a range and a second electrical meter moves the project from a simple ADU permit into a longer review.

A written estimate from us lists each of those line items, so you can see what’s driving the number. It also spells out what’s excluded: landscaping repair after demo, HOA fees, and any structural fix discovered once the drywall comes off. Upfront pricing, no surprises. Call (833) 954-4985 for an exact quote, and ask about 0% financing for 18 months plus $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Allen Homes Specifically Do to a Garage Conversion ADU

Allen built out almost entirely after 1990, so the garages we convert sit inside 1990s-to-2020s subdivision stock rather than older homes. That means we’re working with modern framing, but also with the small lots typical of Allen’s older neighborhoods near the 75002 corridor along US 75. On those lots, the HOA architectural review often takes longer than the city permit, so we fold that approval time into the schedule from day one. In the newer custom homes across 75013, garages tend to be larger, which gives you more room to work with and a higher ceiling on the finished square footage. The ground under all of it is North Texas black clay, which swells and shrinks with the wet-dry cycle. That’s why we check existing slab condition and grading before we commit to a floor plan; a conversion that traps moisture under a slab is a conversion you’ll regret. Hail and spring storms also drive us to spec impact-rated doors and wind-rated windows rather than the cheapest option, since a converted garage is only as resilient as its new exterior wall. We cover all of Allen, from Fairview and Lucas to Murphy and McKinney, and we handle the permitting and inspection side rather than leaving it to you.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Allen

A new stained cedar privacy fence

Get a Free Estimate for Your Garage Conversion ADU in Allen

Call (833) 954-4985 for a free on-site estimate on your garage conversion ADU in Allen. A live person answers, 24/7, and we’ll walk your garage, check the panel and slab, and talk through layout options before we quote a number. You leave the call with a written estimate, a realistic timeline, and a clear next step. No pressure, no vague bids.

Written by the team at Groundwork Construction Co.

Why Allen Chooses Groundwork Construction Co. of Richardson

We set the standard for garage conversion ADU in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in shower

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(833) 954-4985

Request a Free Estimate in Allen

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch