Cabinets & Countertops in Allen, TX: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Allen, TX typically run $14,000 – $45,000 for the combined job, and most of that timeline lives inside one hard number: cabinets take 6 – 10 weeks to arrive after you sign off on the layout, then install and countertop templating add roughly two more weeks on site. You can price the pieces separately – cabinet installation lands at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 – but the lead time is the same either way. Call (833) 954-4985 to schedule a free on-site estimate and get a line-item range for your kitchen.
How the work actually runs, stage by stage

Cabinet and countertop jobs don’t fail on install day. They fail in the two weeks before, when a layout gets locked before the appliances are measured. Here’s the actual sequence we run in Allen kitchens.
Stage 1 – Measure and lock the layout (1 visit, then 1 week to decide). We template the existing space, check wall plumb and floor level, and mark where utilities currently land. You make the layout decisions here: box sizes, drawer stack heights, whether the sink moves, whether the range stays put. Once this is signed, changing it later re-opens lead times and resets the cabinet order.
Stage 2 – Demo and prep (1 – 2 days). Old cabinets and counters come out, and the walls get patched and brought to flat. On Allen homes where a previous owner tiled around a cabinet run, this is where the extra day goes – substrate repair before anything new hangs. You decide here whether the backsplash area gets left open or prepped for tile, and whether flooring runs under the cabinets or stops at the toe kick.
Stage 3 – Cabinet install (2 – 3 days). Bases set and leveled first, then uppers, then trim and fillers. Doors and drawer fronts go on last so nothing gets scratched during the run. This is when you’d confirm hardware placement and pull style if you haven’t already.
Stage 4 – Template the countertops (1 day, then 7 – 14 days at the fabricator). This happens after cabinets are set, never before – slabs get cut to the actual installed footprint, not the drawing. You pick the edge profile and the slab here if it wasn’t chosen earlier.
Stage 5 – Countertop install and final trim (1 day). Slabs set, seams glued and polished, sink and faucet tied in, then toe kick and any final trim. We walk the job with you before we leave.
Total on-site time is usually 8 – 12 working days. The waiting happens around the cabinet order, not on your floor.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll be choosing between
Most of the stress in this job comes from picking under time pressure. Here’s what actually matters on each decision.
- Stock, semi-custom, or full-custom cabinets. Stock is fastest and cheapest but only fits standard dimensions – fine if your walls are square. Semi-custom (KraftMaid and Wellborn both sit here) lets you adjust widths, depths, and door styles to the room and is what most Allen kitchens land on. Full custom costs meaningfully more and buys you non-standard sizing and finishes.
- Quartz vs. granite vs. quartzite. Quartz is non-porous and doesn’t need sealing, which suits a busy family kitchen. Granite is natural, unique slab to slab, and needs resealing every year or two. Quartzite is the hardest of the three and looks closest to marble without the etching – and it’s the priciest. Cambria sits in the quartz camp with a strong pattern selection.
- Slab thickness and edge profile. Standard 2cm or 3cm slabs both work; 3cm reads heavier and often skips the build-up cost at the edge. A simple eased edge keeps the price down; a mitered or ogee profile adds labor.
- Cabinet box construction. Plywood boxes hold up better around sinks and dishwashers than particleboard in a humid kitchen. Soft-close hinges and full-extension drawers are worth the small upcharge on a kitchen you plan to keep.
- Hardware and finish. Painted finishes are easy to touch up; stained wood shows wear differently. This is a decision you can make late without resetting the order.
What Cabinets & Countertops costs in Allen, TX

Plan on $14,000 – $45,000 for the combined cabinet and countertop job in Allen, and expect the number to land in the lower half for a standard-size kitchen with semi-custom boxes and quartz, the upper half once you add an island, relocate the sink, or step into custom cabinetry.
Five variables push the number:
- Kitchen size and run length. Linear feet of cabinet and counter drives material cost more than anything else.
- Layout changes. Moving a sink, range, or dishwasher means plumbing and electrical work, and that adds cost and permit scope.
- Material grade. Stock boxes with a laminate top versus semi-custom with quartzite can be a five-figure spread on the same footprint.
- Island or peninsula. An island adds cabinetry, a second slab, and often electrical for outlets.
- Existing condition. Out-of-level floors or damaged substrate get corrected before install, and that’s labor you don’t see when the job’s done.
A written estimate from us itemizes cabinets, countertops, demo, any plumbing or electrical relocation, and permit fees. It doesn’t cover appliance purchase, backsplash tile, or flooring – those are separate line items with their own ranges. You get the number in writing before anything is ordered, and the 730-Day Done Right Promise covers the workmanship behind it.
See the difference
Before
After
Before
After
Before
AfterWhat Allen homes specifically do to this job
Allen built out almost entirely after 1990, so the kitchens we work in are 1990s-to-2020s subdivision stock – brick-and-frame two-story homes with original oak or white thermofoil cabinets that have hit the end of their useful life rather than needing historic restoration. In the older starter neighborhoods near the 75002 core, we routinely find that the cabinet boxes are sound but the doors, drawer glides, and finish are done. That’s a different job than a 2015 build in 75013 where the owner wants to reconfigure the whole run.
The Collin County permit reality matters here: cabinets and countertops in a like-for-like swap usually don’t need a permit, but relocating a sink, adding a gas line, or moving electrical does, and that pulls inspection into the schedule. On the small lots common in Allen’s 1990s subdivisions, any project that reaches into walls or adds structure also has to clear HOA architectural review, and that clock runs before the city permit clock – worth building into the front end of the schedule rather than discovering halfway through. If your kitchen work turns into something bigger, homeowners often pair this with a Kitchen Remodeling in Allen scope that folds in layout, lighting, and flooring, or with a Garage Conversion ADU in Allen when the goal is added living space instead.
Serving Allen, TX – Our Local Coverage Area
We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Allen

Expect 8 – 12 working days on site, with the bulk of the calendar time spent waiting on the cabinet order (6 – 10 weeks) and the countertop fabricator (7 – 14 days after templating). The install itself moves quickly once materials land. Call (833) 954-4985 and we’ll map the timeline against your order date.
A straight swap of cabinets and countertops in the same footprint generally doesn’t require a permit, but relocating plumbing, gas, or electrical does. We tell you up front which side of that line your job falls on, and we pull and pass inspection when it applies. Call (833) 954-4985 for a straight answer on your specific layout.
Yes, and keeping the sink, range, and dishwasher where they are is the single biggest cost saver on this job – it keeps you at the low end of the $14,000 – $45,000 range and skips the permit entirely. New boxes get built around the existing utility locations. Call (833) 954-4985 and we’ll confirm what your current layout allows.
Combined, the job runs $14,000 – $45,000 in Allen, with cabinet installation at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 as separate line items. The spread comes down to kitchen size, material grade, and whether the layout changes. Call (833) 954-4985 for an exact quote – estimates are free.
Every cabinet and countertop job we install is backed by the 730-Day Done Right Promise – if it isn’t done right, we make it right. You also get the manufacturer’s warranty on the cabinets and slab from brands like KraftMaid and Cambria. Call (833) 954-4985 to walk through what’s covered before you commit.
Get a free estimate on Cabinets & Countertops in Allen
Call (833) 954-4985 and a live person answers, day or night. We’ll set a time to walk your kitchen, measure the actual space, and hand you a written line-item estimate covering cabinets, countertops, demo, and any utility work – no change orders once the number is signed. We cover Allen including 75013 and 75002, and if your project grows past cabinets, that conversation folds naturally into our Kitchen Remodeling service. Thinking about added square footage instead? Homeowners often pair this with a New Detached ADU in Allen. Upfront pricing, no surprises.