A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Allen, TX

New Detached ADU in Allen - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Allen, TX: What It Takes and What It Costs

A new detached ADU in Allen, TX typically runs $90,000 – $220,000 for a full standalone unit with its own foundation, utilities and address, and the build takes four to eight months from permit to final inspection. Detached means a separate structure, not a garage conversion or a bump-out, so it carries its own slab, framing, roof and utility runs. Most Allen homeowners are building one for a parent, an adult child, or rental income on a lot that’s already tight. Call (833) 954-4985 for a free on-site estimate and a written line-item quote before you commit to a footprint.

Call (833) 954-4985

How a New Detached ADU Goes From Empty Lawn to Finished Unit

A remodeled family room with new windows and a window seat

We sequence a detached ADU the same way every time, because the order protects your budget as much as your schedule. Here’s what actually happens, stage by stage.

Stage 1: Site walk, footprint and feasibility (week 1)

Before anything is drawn, we measure your setbacks, check where the sewer tap and electrical service sit, and confirm the lot can physically hold the unit you want. In Allen’s 1990s subdivisions, a rear lot line often leaves less depth than the homeowner expected. You decide the unit size and whether it’s one story or a story and a half at this stage, because that decision drives everything downstream. We also flag whether your HOA architectural review will run before the city permit, which it usually does.

Stage 2: Drawings, HOA approval and permit (weeks 2 – 10)

Plans get drawn, then they go through your HOA architectural committee and the city permit desk. This is the longest stall in the whole job, and it’s where inexperienced builders lose months. You’ll approve the final plan set and pick your exterior finish at the end of this stage. We pull the permits and hold the schedule until approvals land.

Stage 3: Site prep, slab and utilities (weeks 10 – 14)

We strip the lawn, grade for drainage, and pour the slab or set the pier foundation. Trenching for sewer, water and electrical happens here, and the rough plumbing and electrical inspections follow. You don’t have decisions at this stage, but you do get photos of the underground work before it’s covered.

Stage 4: Framing, roof, rough-ins and dry-in (weeks 14 – 22)

Walls go up, the roof goes on, and windows and doors get set so the structure is dried in. Mechanical, electrical and plumbing rough-ins get inspected behind the walls. On black clay lots we pay close attention to grade and downspout runoff here, because that clay moves with the wet-dry cycle and a detached structure’s drainage matters as much as the main house’s.

Stage 5: Finishes, final inspection and walkthrough (weeks 22 – 34)

Insulation, drywall, flooring, cabinets, fixtures and paint. Final inspection closes the permit, then we walk the unit with you line by line. Every ADU we build is covered by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a New Detached ADU

The decisions that matter most on a detached unit are the ones that drive cost and longevity, not the ones that look good on a mood board. Here’s the honest trade-off on each.

  • One story vs. story and a half: A single-story unit is simpler to build and cheaper per square foot, but it eats more of a small Allen lot. A story and a half fits more living space on the same footprint for roughly 10 – 15% more cost, but adds stairs and a more complex roof.
  • Slab vs. pier foundation: Slab is standard and less expensive. On the black clay common across Collin County, a post-tension slab is often the better call for a detached structure that won’t share the main house’s foundation behavior.
  • Exterior cladding: Brick to match the main house costs more but reads as original to the lot. James Hardie fiber cement is the middle path and holds up well against North Texas hail and sun. Stucco is the budget option, but it needs more maintenance in this climate.
  • Roofing: Architectural shingles from a GAF or CertainTeed line are the sensible default. Standing-seam metal costs more up front but shrugs off hail season and lasts longer.
  • Kitchenette vs. full kitchen: A full kitchen with a range and full-size fridge adds real cost, but it’s what makes the unit rentable or genuinely livable for a parent. A kitchenette suits a guest suite or office use.
  • Separate utility metering: A sub-meter or separate meter costs more now but makes the unit cleanly rentable and simplifies taxes later.

What a New Detached ADU Costs in Allen, TX

A framer checking new wall framing on a home addition

Expect $90,000 – $220,000 for a new detached ADU in Allen. The low end is a modest one-story studio on a simple lot with standard finishes; the high end is a two-bedroom unit with a full kitchen, upgraded cladding and separate metering. Five things move that number:

  • Size: Square footage is the biggest lever. A 500 sq ft studio and a 1,000 sq ft two-bedroom are different projects, not different finishes.
  • Utility runs: Distance from your main sewer tap, panel capacity and trenching length all add cost. A unit set far from the house means longer runs.
  • Foundation conditions: Expansive clay and grading needs can push the foundation line up.
  • Finish grade: Standard builder finishes vs. custom cabinetry and tile can swing tens of thousands.
  • Permit and HOA scope: A structure that triggers extra review or utility upgrades costs more to shepherd through.

Your written estimate should break out site prep, foundation, framing, roof, utilities, finishes and permits line by line. It should not include landscaping beyond rough grade, furniture, or appliances unless we’ve priced them in. We use upfront pricing, no surprises: the number you see is the number you pay, and projects over $10,000 get $1,000 off with 0% financing for 18 months available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Allen Homes Specifically Do to a New Detached ADU

Allen is a Collin County growth city that built out almost entirely after 1990, so the housing stock here is 1990s-to-2020s brick-and-frame suburban homes on small lots, not old structures needing repair. That single fact shapes a detached ADU more than anything else. Because the city is now largely built out, the work has shifted from greenfield subdivision build-outs along the US 75 corridor in 75002 toward custom infill and add-on construction on remaining lots in 75013, and an ADU sits right in that current. On the tight lots typical of Allen’s 1990s subdivisions, setbacks and HOA architectural-review requirements often bite before the city permit process even starts, so we budget that approval time into the schedule up front. Add North Texas black clay that expands and contracts with the wet-dry cycle, plus hail and spring storm seasons, and foundation type, lot grading and roof choice become real design decisions here, not afterthoughts. If your project grows into something larger, it’s part of a full Home Additions & ADU in Allen scope we can walk through with you, and we cover the whole city under our Allen service area. Homeowners often pair a new unit with Concrete Driveways & Concrete Work in Allen for a clean approach and parking pad, or with Paver Driveways in Allen if they want the unit to match the main house’s curb appeal. To see how this fits our broader Home Additions & ADU work, we’re glad to map the whole picture.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Allen

A new concrete driveway with a paver border

Get a Free On-Site Estimate for Your New Detached ADU in Allen

If you’re planning a new detached ADU in Allen, the next step is a free on-site estimate. We’ll walk your lot, check setbacks and utility capacity, and hand you a written line-item quote with no vague ranges. Call (833) 954-4985 to schedule. A live person answers around the clock, and our technicians have up to 12 years of experience on jobs like this. Questions welcome before you commit to anything.

Written by the team at Groundwork Construction Co.

Why Allen Chooses Groundwork Construction Co. of Richardson

We set the standard for new detached ADU in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(833) 954-4985

Request a Free Estimate in Allen

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch