







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterFull Kitchen Remodeling in Richardson, TX
Full kitchen remodeling in Richardson, TX typically runs $28,000 to $85,000, with most mid-range gut remodels landing between $42,000 and $60,000 depending on square footage, cabinet grade, and whether walls move. A full remodel means the whole room comes down to the studs and goes back together as a coordinated system: cabinets, counters, electrical, plumbing, flooring, lighting, and ventilation handled by one accountable crew instead of four trades pointing fingers at each other. Call (833) 954-4985 and a live person picks up, day or night, to set up a free estimate.
We’re Groundwork Construction Co. of Richardson, and full-scope kitchen work is one of our seven core service lines. Every remodel is backed by our 730-Day Done Right Promise: if something isn’t right, we come back and make it right. That guarantee is one of the longest workmanship warranties in the residential construction space, and it applies to the whole job, not just the parts that are easy to fix. If you’re still deciding how deep to go, our Kitchen Remodeling overview covers everything from a cabinet refresh to a full gut, and this page goes deep on the full-remodel path specifically.
Richardson kitchens built in the 1960s and 1970s tend to have the same set of problems: a galley footprint walled off from the living room, a 30-inch range squeezed into a corner, one outlet on the whole counter run, and a peninsula that blocks the traffic path to the back door. We see those floor plans constantly in the neighborhoods around Cottonwood Creek, Prairie Creek, and the older sections of the Heights, and we’ve rebuilt enough of them to know which walls are load-bearing and which ones only look like it.

When You Need Full Kitchen Remodeling
A full remodel makes sense when more than one system in the kitchen has reached the end of its life at the same time. A refacing job or a counter swap fixes one layer. This fixes the room. If any of these sound familiar, it’s probably time.
- The cabinets are original and the boxes are failing. Particleboard boxes from the 1970s and 1980s sag at the shelf, the drawer glides are worn out, and the hinges won’t hold adjustment anymore. Once the boxes are shot, refacing is money spent on a frame that won’t last.
- You’re out of counter space and out of outlets. A single 24-inch stretch of counter and one duplex outlet was fine in 1975. If the air fryer, coffee maker, and mixer have to take turns, the electrical layout is the real problem, and that means opening walls.
- The floor plan fights the way you actually live. A wall between the kitchen and the family room, a peninsula nobody uses, a walkway that’s too narrow for two people. In a lot of Richardson homes, taking out one non-bearing wall changes the whole house.
- There’s old plumbing behind the walls. Galvanized supply lines and cast-iron drains show up in kitchens of a certain age around here, and they tend to leak at the joints under the sink. If the walls are coming open anyway, replacing them then is far cheaper than doing it twice.
- The layout is a safety problem. The range sits too close to a combustible surface, the hood recirculates instead of venting outside, or there’s no working vent at all. Those are the fixes worth making first.
- You’re planning to stay a while. A full remodel is a long-horizon decision. If this is a five-year house, a lighter refresh may serve you better, and we’ll tell you so honestly in the estimate instead of selling you a bigger job.
One local note: Richardson sits on expansive clay soil, and that matters for kitchens. We regularly see slab movement show up as cracked tile grout lines and cabinets that no longer sit plumb against the wall. In a full remodel we check for it early. Setting cabinets level on a floor that’s already out of plane just means the counters and backsplash come out crooked later.
Our Full Kitchen Remodeling Process
Every full remodel follows the same sequence. It’s not glamorous, but it’s why the job finishes on schedule and why surprises get caught on paper instead of in your living room.
- Free estimate and design consult. We walk the kitchen, measure everything, look at the panel and the plumbing, and talk through how you cook and entertain. You get upfront pricing with the scope spelled out. The number you see is the number you pay, and there are no allowances that quietly balloon halfway through. This visit is free and there’s no obligation attached to it.
- Design, selections, and permitting. We finalize the layout and help you choose materials from our curated brand partners, including KraftMaid cabinetry and Cambria quartz surfaces. Then we pull the City of Richardson permits. Any remodel that moves plumbing, gas, or electrical needs permits and inspections, and skipping them creates a problem the day you sell the house.
- Protection and demolition. We seal off the work area, protect the floors and adjacent rooms, and tear the kitchen down to the studs. Anything worth salvaging gets set aside. This is usually the loudest, dustiest week, and we tell you that going in.
- Rough-in trades. Framing changes, new electrical circuits and outlets, plumbing rough-in, gas line work, and HVAC or venting happen in sequence, and each one gets inspected before it’s closed up. We don’t bury work that hasn’t been looked at.
- Drywall, cabinets, counters, and finishes. Insulation, drywall, paint, cabinet install, template and install for the counters, then tile, flooring, lighting, and appliances. The crew on site is background-checked and in uniform on every visit, so you always know who’s in your house.
- Final walkthrough. We go through the kitchen together with a punch list, fix what’s on it, and hand over the paperwork. Your 730-Day Done Right Promise starts at completion. If something isn’t right six months or eighteen months later, you call and we come back.

Full Kitchen Remodeling Pricing in Richardson
Upfront pricing means you get real numbers before anyone swings a hammer. Here’s what full kitchen remodeling runs in Richardson right now, broken out by line item. These are ranges, not quotes. Your exact number depends on the size of the room, the layout changes, and the material grade you pick.
| Scope item | Typical Richardson range |
|---|---|
| Full remodel, smaller galley kitchen (roughly 80-120 sq ft), semi-custom cabinets | $28,000 – $45,000 |
| Full remodel, mid-size kitchen (roughly 140-200 sq ft), standard layout | $42,000 – $60,000 |
| Full remodel, large or open-concept kitchen with a wall removed | $60,000 – $85,000+ |
| Cabinetry (KraftMaid semi-custom, installed) | $9,000 – $22,000 |
| Countertops (Cambria quartz, fabricated and installed) | $4,500 – $9,000 |
| Electrical (new circuits, outlets, recessed lighting) | $2,500 – $5,500 |
| Plumbing (sink relocation, new supply and drain rough-in) | $1,500 – $4,000 |
| Flooring (LVP or tile, installed) | $2,000 – $6,000 |
| Backsplash tile (material and install) | $1,200 – $3,500 |
| Appliances (mid-range package) | $4,000 – $12,000 |
What moves the number most: whether a wall comes out, how far the sink and range move from their current locations, and the cabinet grade. Removing one non-bearing wall in a Richardson ranch and reworking the layout can add $3,000 to $6,000 on its own, mostly in framing, drywall repair, and ceiling patching. Premium cabinet finishes and slab counters do more to the total than most people expect, so we price both the semi-custom and the upgrade path side by side and let you decide.
Financially, a full remodel doesn’t have to be a lump sum. We pair our upfront pricing with 0% financing for 18 months, and projects over $10,000 get $1,000 off. That’s standing offer, plain and simple. The estimate itself is free, including the design consult. Call (833) 954-4985 and we’ll get your numbers on paper.
What affects the cost most in Richardson
- Layout changes. Same footprint costs less than a rearranged one. Moving the sink or range means moving supply, drain, and gas lines, plus patching the old locations.
- Cabinet grade. Stock, semi-custom, and full custom sit at very different price points. KraftMaid gives you a wide range inside one brand, and we walk you through where the money shows up and where it doesn’t.
- Counter material. Cambria quartz is a different line item than laminate, but it also outlasts most of what it replaces. Worth pricing both ways.
- What’s behind the drywall. Old plumbing, outdated wiring, or unexpected water damage only shows up after demolition. We build a contingency into the budget conversation up front so a surprise doesn’t stop the job.
- Permit and inspection scope. Anything touching structure, plumbing, gas, or electrical in Richardson needs permits and inspections. That cost is part of doing it right, and it’s in the upfront number, not added later.
Repair or replace: is a full remodel worth it?
Usually yes if two or more of the big systems (cabinets, electrical, plumbing) are at the end of their life at once. If only the counters are dated and the cabinets are solid, a smaller project is the smarter spend. We’ll tell you which one you’re looking at in the free estimate, and we won’t pad a light refresh into a gut job to make it worth our time.
Our Richardson brand partners
The materials in your kitchen come from names that stand behind them. We work with KraftMaid for cabinetry and Cambria for quartz surfaces in kitchens, and we choose brands with real warranty support behind them. If your project also touches an exterior door or window that opens to the backyard, our Andersen and Pella partnerships cover the products, and if the project extends to the patio, some homeowners add a fence line at the same time. We handle fencing in other categories, so if your plans grow, we can usually keep it under one roof rather than handing you off to another contractor.
Why homeowners hold off, and why they don’t have to
The two reasons people delay a full remodel are money and disruption. Disruption is real, and we plan around it: we sequence the job so you’re washing dishes in a utility sink instead of a bathroom for weeks on end, and we tell you honestly how many days each phase takes. Money is what the financing and the $1,000 off offer exist to solve, so the project feels like a manageable budget line instead of a windfall. And the 730-Day Done Right Promise means the work stands behind itself long after the crew leaves. You shouldn’t have to gamble on the biggest investment in your house.
Background-checked, uniformed technicians on every job. Calls answered by a live person, 24/7. Upfront pricing, no surprises. That’s the standard on every full kitchen remodel, and it’s the same standard on every other service line we run across the Dallas north suburbs.
What to check before you call
You’ll get more out of the first visit if you’ve thought these through. None of these require a tape measure or any tools.
- How many people cook in the kitchen most days, and do you entertain big groups?
- Which appliances stay and which get replaced?
- Do you want the wall to the living room gone, or are you open to keeping the current layout?
- What’s your rough budget range, so we can tell you what fits inside it?
If you’re on the fence about the scope, reading through our Kitchen Remodeling in Richardson page first is a good way to line up your options before we walk in the door.
A quick word about safety
A full remodel touches things that can genuinely hurt you if handled wrong. Gas line work, moving a 240-volt range or oven circuit, and anything that involves cutting into a wall that might be structural all need a trained, licensed professional and the right permits. We don’t recommend a homeowner open those up to take a look, and neither should any contractor worth hiring. The most expensive lesson in a kitchen is a gas leak or an overloaded circuit that was “checked” by someone with a YouTube tab open. Leave it to the people who do it for a living.
FAQs – Full Kitchen Remodeling
How long does a full kitchen remodel take in Richardson?
Most full kitchen remodels in Richardson take 6 to 10 weeks from demolition to final walkthrough. The big variables are permit and inspection timing with the City of Richardson and whether any hidden plumbing or electrical problems turn up once the walls are open. A smaller galley kitchen with the same footprint can finish faster. A large open-concept job with a wall removed and a sink relocated sits at the longer end. Call (833) 954-4985 and we’ll give you a realistic timeline for your specific kitchen, not a generic one.
Do I need permits for a full kitchen remodel in Richardson?
Yes, if the project changes anything structural, plumbing, gas, or electrical, which a full remodel almost always does. The City of Richardson requires permits and inspections for those items, and the inspection record follows the house. We pull the permits and coordinate the inspections as part of the job, and we don’t recommend any remodel that hides that work instead of getting it checked. Call (833) 954-4985 with your project details and we’ll tell you exactly what your kitchen needs.
Can you work with my existing appliances or do I need all new ones?
We work with whatever you’re keeping and we’ll plan the layout around it. Reusing a good range or fridge is a perfectly reasonable way to control the budget, and we’ll flag any appliance that’s likely to fail so you’re not pulling a new cabinet out to replace a fridge two years from now. If you’re debating between keeping and upgrading, call (833) 954-4985 and we’ll help you sort out the trade-off in the free estimate.
What does the 730-Day Done Right Promise actually cover?
The 730-Day Done Right Promise covers workmanship on the job for 730 days after completion. If a cabinet door sags, a joint fails, or the work isn’t right, you call us and we come back and fix it. It’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing, not a verbal promise. Call (833) 954-4985 and we’ll walk you through what the guarantee covers and how a warranty call works.
Can I finance a full kitchen remodel?
Yes. We offer 0% financing for 18 months, and projects over $10,000 get $1,000 off. Between the financing and the discount, a full remodel in Richardson becomes a monthly budget line instead of a cash lump sum. Upfront pricing means you know the total before you sign, and the total doesn’t move. Call (833) 954-4985 for a free estimate and design consult and we’ll lay out the financing options with your numbers.
Ready to start? Call (833) 954-4985 for a free project estimate and design consult. A live person answers, 24 hours a day. We’ll walk your Richardson kitchen, put real numbers on paper, and show you exactly what a full kitchen remodel looks like with one accountable crew, upfront pricing, and a 730-Day Done Right Promise behind it. From foundation to finish line, built to last, backed in writing.
Written by the team at Groundwork Construction Co. of Richardson, serving Richardson.


