Garage Conversion ADU in Garland: What It Costs and How Long It Takes
A garage conversion ADU in Garland typically runs $45,000 – $130,000 and takes 10 to 16 weeks from demolition to final inspection, depending on whether the slab is sound and how far the plumbing has to travel. You’re turning an attached or detached garage into a permitted, rentable living space with its own sleeping area, bathroom, and kitchenette. Call (833) 954-4985 to schedule a free on-site estimate. We answer live, day or night.
How the Work Actually Runs, Stage by Stage

Most contractors wave a hand at “we handle everything.” Here’s the real sequence, with the decisions you’ll be making and roughly when you’ll make them.
Stage 1: Assessment and drawings (weeks 1 – 3)
We open walls, check the existing slab for cracking and settlement, verify the electrical panel has room for a sub-panel, and trace where drain lines can tie in. You’ll decide the layout – one big open studio or a bedroom plus living area – and the door and window placement. That layout drives everything downstream, so this is your heaviest decision week.
Stage 2: Permits and approvals (weeks 3 – 6, overlapping design)
We pull the building permit and file what the City of Garland needs for the conversion. You’ll choose your exterior finish here – lap siding or panel – because the finished façade has to read as living space, not a garage door. This is the stage where a slow approval can eat two weeks, so we file early.
Stage 3: Structural and rough-in (weeks 5 – 9)
We close the old garage opening, frame new interior walls, and run new plumbing, electrical, and HVAC lines. On a Garland slab this means trenching the concrete for drains and patching it back. The city inspects rough framing, rough electrical, rough plumbing, and rough mechanical at this point – four separate inspections most homeowners don’t expect. You’ll pick fixtures now: toilet, vanity, shower configuration, and appliance rough-ins.
Stage 4: Insulation, drywall, and finishes (weeks 8 – 13)
Spray foam or batt insulation, then drywall, then flooring, cabinets, tile, paint, and trim. This is the longest visual stretch, and it’s where material grade starts showing. You’ll confirm cabinet layout and countertop material about two weeks before install.
Stage 5: Final inspection and close-out (weeks 13 – 16)
Final building, electrical, plumbing, and mechanical inspections, then the certificate of occupancy. We walk the unit with you before we call it done. Every project here carries our 730-Day Done Right Promise, so if something fails after close-out, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
- Slab in place vs. new subfloor. Keeping the existing slab is cheapest and fastest, but Garland’s blackland clay moves, and a cracked slab can telegraph through tile or glued floors. A floating subfloor over the slab adds roughly $3,000 – $6,000 and buys you level, insulated, warmer floors.
- Trenching the slab vs. raising on a platform. A conventional bathroom means jacking out the slab for drains. If the slab is already compromised, a raised floor lets you run plumbing above grade instead of through it – more headroom lost, less concrete risk.
- Mini-split vs. extending the house system. A dedicated ductless mini-split is simpler, zoned separately, and won’t strain an older furnace. Tying into the existing system is cheaper up front if the panel and ductwork have capacity – and a 1970s ranch often doesn’t.
- Cabinet grade. KraftMaid and Wellborn both make a solid, warranted cabinet line for a kitchenette; the honest trade-off is that a rental unit doesn’t need a full chef’s kitchen, so spend the budget on the bathroom and floors instead.
- Exterior finish. James Hardie fiber cement siding holds up to North Texas sun and hail far better than wood or vinyl, and it’s what we’d put on a Garland conversion we expected to outlast the original house.
- Tank vs. tankless water heater. A small tank fits a closet and costs less; tankless frees the closet and gives continuous hot water but needs gas capacity, venting, and a higher install cost.
What Garage Conversion ADU Costs in Garland, TX

Most Garland garage conversions land between $45,000 and $130,000. The low end is a detached conversion with an existing good slab, plumbing close to the tie-in, and modest finishes; the high end is an attached conversion with heavy slab repair, a raised bathroom floor, upgraded systems, and premium cabinets and tile.
- Size and layout: A 400 sq ft studio versus a 600 sq ft one-bedroom unit changes framing, drywall, flooring, and HVAC sizing across the board.
- Slab condition: Cracked or settled slabs push the number up fast – repair, resurfacing, or replacing the slab under the new floor.
- Distance to utilities: Every extra foot of drain trench and sub-panel feed is real money. Garage conversions where the bathroom sits near the existing sewer tap cost noticeably less.
- Material grade: Cabinet, countertop, tile, and flooring selections swing the finish budget by $10,000 or more.
- Permit and inspection scope: A permitted, rentable unit with a certificate of occupancy requires more than an unpermitted garage room, and it protects you when you sell.
A written estimate from us lists line items – demo, framing, rough plumbing, rough electrical, HVAC, insulation, drywall, finishes, permits, inspections – plus the 730-Day Done Right Promise in writing. What it won’t include unless you ask: landscaping repair outside the work area, replacement of a failing main panel, or anything the inspection turns up inside the existing house.
See the difference
Before
After
Before
After
Before
AfterWhat Garland Homes Specifically Do to This Job
Garland is a renovation town. The housing stock is dominated by mid-century slab-on-grade ranches from the 1950s – 60s core around downtown and the 1970s – 80s sprawl toward Rowlett and Sachse, which means we’re reading original framing and plumbing plans far more often than we’re framing new. Those old garages sit on blackland clay that swells and shrinks hard through North Texas summers and wet winters, and slab movement is the first thing we check. In the 75040 and 75041 ZIP codes near downtown, mature pecan and oak canopies hang over detached garages and their driveways – tree-root pressure on slabs and low limbs over the work area change how we prep the site and stage materials.
The permitting reality is real but manageable: a full ADU conversion needs a building permit and a certificate of occupancy to be rentable, and the City of Garland inspects rough work in four trades before drywall goes up. If your project grows past the garage into new footprint, that’s a different scope – start with our Home Additions & ADU in Garland page. We cover Garland and the surrounding communities, and homeowners often pair a conversion with a fresh driveway or parking apron – see Concrete Driveways & Concrete Work in Garland or Asphalt Driveways & Resurfacing in Garland once the bay becomes a bedroom and daily parking moves.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Garland

Most Garland conversions take 10 to 16 weeks from demolition to final inspection, with permitting and design as the two stages that most often stretch the timeline. Call (833) 954-4985 for a free estimate and a stage-by-stage schedule.
Yes – to be a legal, rentable unit with a certificate of occupancy, a garage conversion in Garland needs a building permit and trade inspections. We pull the permits and pass the inspections; that paperwork protects your resale and your rental income.
Sometimes. If the garage sits close to the existing sewer tap and the slab is sound, plumbing work is limited; if not, we trench the slab or raise the bathroom floor. Structural changes are usually limited to closing the garage opening and framing interior walls. Call (833) 954-4985 and we’ll tell you which case yours is.
A garage conversion ADU in Garland runs $45,000 – $130,000 depending on size, slab condition, utility distance, and finish grade. Call (833) 954-4985 for an exact written quote – estimates are free.
Every conversion we build is covered by our 730-Day Done Right Promise – one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right.
Get a Free On-Site Estimate for Your Garland Garage Conversion
We’ll walk the garage with you, check the slab and panel, and give you a written line-item estimate for the conversion – no vague ballpark, no surprise change orders. Our technicians have up to 12 years of experience, arrive in uniform, and every job is backed by the 730-Day Done Right Promise. Call (833) 954-4985 to schedule your free estimate. If your plans grow beyond the garage, see our Home Additions & ADU service for the full scope.
Written by the team at Groundwork Construction Co.