A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · McKinney, TX

ADU Site Prep & Utilities in McKinney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in McKinney: What the Work Actually Involves

ADU site prep & utilities in McKinney runs $45,000 – $130,000 for the groundwork and service work alone, before the structure itself, and typically takes 4 – 8 weeks from first stake in the ground to final utility inspection. That covers grading and excavation, the slab or pier-and-beam foundation, water and sewer tie-ins, the electrical service run, and gas if you’re extending it. Call (833) 954-4985 and we’ll walk your lot, check the utility map, and put a real number on paper.

Call (833) 954-4985

What We Do First, Third, and Last on a McKinney ADU Site

A second-story addition that matches the existing roofline

Site prep and utilities aren’t one job, they’re a sequence, and the order matters more than most homeowners expect. Here’s how it runs on a McKinney lot.

Stage 1: Utility locate and survey (days 1 – 3). Before anything gets dug, we call in the locate service and confirm where the existing water, sewer, gas, and electric actually run. On the north side out in 75070 and 75071, that’s usually clean because the subdivisions were platted with recorded easements. Downtown in 75069 it’s a different animal: old service laterals that don’t match the plat, sometimes a shared line. You decide here whether we tie into the existing service or pull a new meter, and that decision sets the electrical and water budget.

Stage 2: Excavation and grading (days 3 – 8). We strip topsoil, cut the pad to grade, and shape the drainage so water moves away from both the ADU and the main house. Expansive clay is the whole story here. You’ll decide whether you want a post-tension slab or a pier-and-beam foundation, and that call is driven by soil test results, not preference.

Stage 3: Foundation (days 8 – 18). Form, rebar or post-tension cable, inspection, pour, cure. Concrete cure time in a McKinney July is a real scheduling item, not a formality.

Stage 4: Rough utilities (days 18 – 30). Sewer trench and lateral to the tie-in point, water line, electric conduit from the meter or main panel, gas line if you’re running it. This is the stage where a sewer line that has to cross an existing driveway or a mature pecan tree changes the price fast.

Stage 5: Inspections and backfill (days 30 – 40+). Rough plumbing and electrical inspections, then backfill, compaction, and final grade. You get a written punch list and the inspection sign-offs in hand.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Site and Utility Choices You’ll Make

These are the decisions that move your number, and the honest trade-off on each.

  • Foundation type. Post-tension slab is faster and cheaper on flat, well-drained lots in the newer subdivisions. Pier-and-beam costs more upfront but handles the clay movement better and gives you access to plumbing underneath, which matters on infill lots near the historic core.
  • Electrical service. Tying into your existing panel is cheaper if there’s capacity. A separate meter means a second monthly bill but keeps the ADU easy to rent or hand to family.
  • Sewer tie-in. Gravity lateral to the existing line is straightforward. If grade won’t cooperate, a lift pump adds cost and a maintenance item you should know about before you commit.
  • Grading and drainage. Basic slope-away grading is included. French drains, retaining, or a swale to redirect runoff from a neighboring lot is extra, and on tight downtown lots it’s often necessary.
  • Utility trench depth and conduit. Direct-burial cable is the cheap route. Conduit costs more and lets you pull new wire later without digging. For a structure you plan to keep for decades, conduit is the better buy.

Where the ADU ties into siding or trim, we spec James Hardie because it holds up to North Texas sun and hail without the repaint cycle wood demands.

What ADU Site Prep & Utilities Costs in McKinney, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for site prep and utilities on a McKinney ADU, with most jobs landing between $60,000 and $95,000. Site prep and utilities is a slice of the full Home Additions & ADU in McKinney budget, which runs $90,000 – $220,000 once the structure is included. Five things push a job toward the top of that range.

  • Lot condition. A flat, cleared lot in a newer 75071 subdivision sits at the low end. A sloped or tree-heavy downtown lot needing retaining and extra grading runs high.
  • Distance to utilities. Every extra foot of trench to reach the sewer main or the panel adds cost. Corner lots and deep setbacks pay for it.
  • Utility relocation. Moving an existing line, meter, or easement is the single biggest surprise line item.
  • Tie-in complexity. Gravity sewer is cheap; a lift pump or a long water run is not.
  • Permit scope. Historic district review in the 75069 core can add weeks and a design review fee a subdivision lot never sees.

Your written estimate lists excavation, foundation, utility runs, inspections, and backfill line by line. It doesn’t cover the ADU structure itself, finishes, or landscaping beyond final grade. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What McKinney Lots Specifically Do to This Job

McKinney’s growth pattern makes this job two different projects depending on which ZIP you’re in. Out in 75070 and 75071, you’re working greenfield subdivision lots platted with clean easements and fast-track permitting, so site prep moves predictably. Downtown in 75069, new construction sits blocks from century-old homes, and the Historic Preservation Advisory Board reviews exterior changes to contributing structures. That review can add weeks, and on infill lots we routinely find old service laterals that don’t match the recorded plat. The clay underneath both is the same: expansive soil that swells and shrinks with our wet-dry cycles, which is why post-tension slabs and pier-and-beam leveling are routine here and why we pour early in the morning when summer pushes past 100°F. Homeowners in Stonebridge Ranch and around the downtown square both end up asking the same question about drainage, and both deserve a real answer before we break ground.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in McKinney

A remodeled primary bathroom with a soaking tub and walk-in shower

Get a Free Site Prep & Utilities Estimate in McKinney

Call (833) 954-4985 and a live person answers, day or night. We’ll schedule a free on-site walk of your lot, check the utility map, and follow up with a written, line-item estimate for the site prep and utilities. Many homeowners pair the groundwork with a new Concrete Driveways & Concrete Work in McKinney or Paver Driveways in McKinney project while the equipment is already on site. See our Home Additions & ADU service and our McKinney coverage area to plan the rest.

Written by the team at Groundwork Construction Co.

Why McKinney Chooses Groundwork Construction Co. of Richardson

We set the standard for ADU site prep & utilities in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(833) 954-4985

Request a Free Estimate in McKinney

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch