







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across McKinney
Groundwork Construction Co. of Richardson builds home additions and ADUs for McKinney homeowners who want a straight answer about what their project will cost and what it will turn up once the walls come open. We know the difference between a fast-track subdivision out in 75071 and a century-old bungalow near the downtown square, and we plan the job around that difference. Our technicians have up to 12 years of experience, every project is covered by our 730-Day Done Right Promise, and calls are answered by a live person 24/7. Call (833) 954-4985 to schedule a free estimate.
Why Groundwork Construction Co. of Richardson Is McKinney’s Preferred Home Additions & ADU Company

McKinney homeowners have heard the same vague pitch from every builder in Collin County, so we lead with something you can hold us to: a written, line-item scope and a 730-Day Done Right Promise that covers the workmanship long after the punch list is closed. The number you see on your estimate is the number you pay, and if something changes, you approve it in writing before anyone lifts a tool.
We’ve built a strong local reputation across McKinney by treating additions as a permit-and-foundation problem first and a construction problem second. That’s the mindset that keeps a project on schedule. Our technicians arrive background-checked and in uniform, and when your project is ready, we can move quickly because our pricing, permitting and material planning are already settled before the first day of work.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in McKinney
ADU Design & Permitting
Every McKinney ADU starts with an honest read on what the lot and the existing structure will allow. We pull the permits and coordinate the inspections, and in the 75069 historic core we plan around the Historic Preservation Advisory Board review early rather than discovering it mid-project. Design, drawings and permit submittal are handled as one package.

Garage Conversion ADU
A garage conversion is the leanest path to a rentable or multigenerational unit in McKinney, often running $30,000 – $80,000 versus a detached build. The work goes well beyond drywall: plumbing, electrical, insulation, egress, and a foundation check on the existing slab all have to pass. We scope all of it upfront.

New Detached ADU
A new detached ADU in McKinney is a full small-home build, and it prices accordingly at $90,000 – $220,000. Siting is the first decision, and on the expansive clay soils in 75070 and 75071 that means evaluating the foundation and drainage before we pour anything. James Hardie siding and Andersen windows are common choices here for both looks and long-term durability.

Junior ADU & Interior Conversion
Not every McKinney homeowner needs a separate structure. A junior ADU or interior conversion carves out a legal, self-contained living space inside the existing footprint, which can be the most cost-effective option for a parent, an adult child, or rental income. We handle the layout, the code upgrades and the permits together.
Trusted Brands We Service in McKinney
We work with a curated set of material brands so you choose quality, not just what happens to be available. For additions and ADUs in McKinney, that often means James Hardie siding that stands up to Texas sun, KraftMaid or Wellborn cabinetry if the project includes a kitchenette, and Cambria quartz for hard-working surfaces. We don’t stock parts locally or run a warehouse; we spec the right materials for your build and bring them to the job when the schedule calls for them. That keeps turnaround tight and the finish consistent from foundation to finish line.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in McKinney Homes
Opening up an older McKinney home is where budgets live or die. Here’s what we routinely find and how we handle it.
- Hidden wiring and framing. Older homes in the 75069 core often carry knob-and-tube wiring and undersized framing that current code won’t accept once walls are open. Those upgrades get priced and approved before the new work proceeds.
- Expansive clay soil movement. In 75070 and 75071, post-tension slabs can shift within 10 to 15 years, and attaching an addition or ADU to a moving slab is asking for cracks. We evaluate the foundation before we build on it.
- Historic review delays. Exterior changes to a contributing structure downtown require Historic Preservation Advisory Board approval, and that review can add weeks that stall the draw schedule. We build that time into the plan.
- Failed waterproofing at old additions. Prior bump-outs on McKinney homes frequently show failed flashing and waterproofing where they meet the original walls. We correct the envelope before closing it back up.
Pricing for Home Additions & ADU in McKinney, TX
Here’s what McKinney homeowners actually pay for this work, in real ranges rather than a shrug. A typical room addition in McKinney runs $45,000 – $130,000 depending on square footage and how much structural and code work the existing house demands. A garage conversion ADU lands around $30,000 – $80,000, and a fully detached ADU runs $90,000 – $220,000 once foundation, utilities and finishes are included. Opening walls on an older home can uncover wiring and framing that changes the number, which is exactly why we write allowances into the contract and price any surprise in writing before we proceed. Estimates are free, and projects over $10,000 get $1,000 off with 0% financing for 18 months available.
| Service | Typical McKinney Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near McKinney
We bring the same Home Additions & ADU work to homeowners in Allen, Fairview, Lucas and Murphy, and the clay-soil and permit lessons we’ve learned in McKinney carry directly to those neighboring towns. If you’re just outside the McKinney city limits, call and we’ll confirm coverage for your address.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in McKinney

It can add weeks to the front end of your project. Any exterior change to a contributing structure in the 75069 core has to clear the Historic Preservation Advisory Board, and that review doesn’t run on the fast-track pace of the 75070 and 75071 subdivisions. We plan for that approval early so it doesn’t stall your draw schedule later. Call (833) 954-4985 and we’ll walk through the timeline for your property.
Expect a code upgrade, because knob-and-tube wiring won’t pass once the walls are open on a permitted addition. The good news is it’s handled predictably: we write an electrical allowance into the contract, and any discovered issue is priced via a change order you approve in writing before we proceed. Call (833) 954-4985 for a free estimate that accounts for it.
Because the expansive clay soils under those subdivisions swell and shrink with the region’s wet-dry cycles, and post-tension slabs can shift within 10 to 15 years of a fast build. Attaching an addition or ADU to a moving slab invites cracks and callbacks, so we evaluate the foundation first. Call (833) 954-4985 to schedule an evaluation and free estimate.
Allowances are written into your contract for the items we can’t see until walls open, like wiring and framing, and anything beyond those allowances is priced in a written change order you approve before we proceed. You’ll never get a surprise number after the fact. Call (833) 954-4985 for upfront pricing with no surprises.
A garage conversion needs a building permit plus electrical, plumbing and mechanical permits, and often a foundation and egress review depending on the existing garage. We pull the permits and coordinate the inspections so the unit is legal and insurable when it’s done. Call (833) 954-4985 for a free estimate and a permit plan.
Ready to price your McKinney addition or ADU? Call Groundwork Construction Co. of Richardson at (833) 954-4985 for a free estimate and design consult. Additions and ADU work is planned, permitted and built right, and it’s all covered by our 730-Day Done Right Promise.
Written by the team at Groundwork Construction Co.












