Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in McKinney: What They Really Cost and How Long They Take
New cabinets and countertops in McKinney typically run $14,000 to $45,000 for a full kitchen’s worth of both, and a straightforward tear-out-and-replace takes about two to four weeks from demo to final caulk. The sequence matters: cabinets are set and leveled first, then the countertop template is taken, and the stone gets fabricated off-site before it ever shows up in your driveway. Call (833) 954-4985 to schedule a free on-site estimate and we’ll price your actual layout, not a ballpark.
How the work actually unfolds, stage by stage

Most homeowners picture a single crew arriving and staying until it’s finished. The reality is a tight handoff between trades, and knowing the order is what keeps a McKinney kitchen from sitting torn up for two months.
Stage 1: Measure, order, and lead time (2 to 5 weeks before demo)
We measure every wall, check for out-of-square corners and floor level, and confirm appliance sizes so the cabinet run gets planned around your refrigerator and range, not the other way around. Cabinet orders carry the longest lead time in the whole job, typically three to five weeks for semi-custom lines. This is when you lock the door style, finish, and box construction, because changing your mind after the order goes in resets the clock.
Stage 2: Demo and prep (1 to 2 days)
Old cabinets and countertops come out, and this is where surprises surface. In older McKinney homes we open a wall and find water damage under a sink, or a previous owner’s creative plumbing. The floor gets checked for level, and any soft spots get addressed before new boxes go down. You’ll want a temporary kitchen setup somewhere in the house for this stretch.
Stage 3: Cabinet installation (2 to 3 days)
Boxes get set, shimmed, and leveled, then screwed together and anchored to the wall so the run acts as one rigid unit. Crown molding, light rail, and fillers close the gaps to the ceiling and walls. Doors and drawers usually go on last so they don’t get knocked around during the countertop phase, and you’ll walk the layout with us before anything gets drilled.
Stage 4: Template, fabricate, install countertops (7 to 14 days)
Once the base cabinets are set, the stone fabricator templates the exact shape with the sink cutout and any cooktop opening. Quartz or granite slabs get cut and polished in the shop, then installed and seamed on site. This is the stage that keeps the kitchen unusable the longest, so plan accordingly.
Stage 5: Sink, plumbing, and punch list (1 to 2 days)
The sink gets set and sealed, the faucet and disposal connect, and we run the final checklist: door alignment, drawer glide adjustment, caulk lines at the backsplash edge. You get a walkthrough and a written list of anything still open. That’s the handoff into the 730-Day Done Right Promise, which covers the workmanship long after we’ve packed up.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually be making
- Semi-custom vs. stock cabinets. Stock boxes are cheaper and faster but limit you to standard widths, which leaves awkward filler strips. Semi-custom lets you hit odd wall lengths exactly, and brands like KraftMaid offer the door styles and finishes most McKinney homeowners want in a mid-range kitchen.
- Quartz vs. granite vs. butcher block. Quartz is non-porous, needs no sealing, and handles the daily wear of a busy household. Granite is natural stone with pattern variation no two slabs share, but it needs periodic sealing. Butcher block is warm and inexpensive but wants oiling and won’t tolerate standing water.
- Box construction. Plywood boxes hold screws better than particleboard over the long haul, especially in a kitchen with heavy dishes. It’s a small upcharge that pays off in a decade.
- Door profile and finish. Painted shaker is the current default, thermofoil is budget-friendly but can peel at the edges in heat, and stained wood shows wear more gracefully than white paint.
- Countertop edge profile and thickness. A simple eased edge on 3cm stone keeps cost down; a built-up 6cm edge with a miter looks substantial and adds to the fabrication bill.
- Island or peninsula. An island adds prep space and a gathering spot, but it eats floor area. In smaller McKinney kitchens a peninsula often does more work than an island that crowds the walkway.
What Cabinets & Countertops costs in McKinney, TX

Plan on $14,000 to $45,000 for cabinets and countertops together on a full kitchen, with the split running roughly $4,000 to $13,000 for cabinet installation and $2,000 to $6,500 for the countertops themselves. The low end is stock boxes with a standard quartz top on a small galley layout. The high end is a large open kitchen with semi-custom cabinetry, a big island, and premium stone.
Five things push the number up or down:
- Linear footage and cabinet count. A 10-foot run and a 30-foot run aren’t the same job, and tall pantry cabinets cost more than base boxes per unit.
- Existing condition. Out-of-level floors, damaged subfloor, or wall movement from McKinney’s clay soils add prep labor before a single cabinet goes in.
- Moving plumbing or electrical. Relocating a sink or adding under-cabinet lighting means opening walls and pulling permits, which adds days and dollars.
- Material grade. Stock particleboard with a laminate top versus plywood boxes with a quartz slab is most of the spread in this price range.
- Permit scope. A straight cosmetic swap usually needs no permit; anything that touches plumbing, gas, or electrical does.
Our written estimate lists cabinet line, countertop material and thickness, sink and faucet if included, demo and haul-away, and the labor line. Appliances, backsplash tile, and flooring generally sit outside a cabinets and countertops estimate unless you ask us to fold them in. If the wider project is on your mind, that’s where our Kitchen Remodeling service picks up the rest of the scope.
See the difference
Before
After
Before
After
Before
AfterWhat McKinney homes specifically do to this job
This city makes cabinet work harder than a lot of North Texas because the housing stock runs in two directions at once. In the 75069 historic core around the downtown square, we’re in late-1800s Victorian and early-1900s bungalows where walls are rarely plumb, floors are pier-and-beam with their own personality, and opening a wall sometimes turns up knob-and-tube wiring that has to be dealt with before the new cabinets go on it. Those downtown projects also sit under the Historic Preservation Advisory Board’s review for exterior changes, and the approval timeline can add weeks that don’t exist on a subdivision job. Out in 75070 and 75071, we’re in 2000s-and-newer tract homes where the structure is sound but the slab has had a decade or more to move on McKinney’s expansive clay soils, so leveling a cabinet run sometimes means shimming more than you’d expect. This is exactly why our Kitchen Remodeling in McKinney work gets planned around the house we’re actually standing in.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked about Cabinets & Countertops in McKinney

Most run two to four weeks on site, plus three to five weeks of cabinet lead time before demo starts. The countertop template-and-fabricate window is the longest single gap, so the total from order to final walkthrough often lands near six to eight weeks. Call (833) 954-4985 and we’ll map a real timeline for your layout.
Not usually, if you’re keeping the sink, gas line, and outlets where they are. A permit becomes necessary the moment plumbing, gas, or electrical gets moved, and downtown projects in 75069 may also touch historic review. We pull the permits that apply and stand behind the inspections with the 730-Day Done Right Promise.
Yes, in most cases. A countertop-only swap is a one to two week job and runs $2,000 to $6,500. It only gets complicated if the existing cabinets are out of level or the old top was glued down hard, which adds demo time.
Expect $14,000 to $45,000 for cabinets and countertops together, depending on size, material grade, and whether anything gets relocated. We give you a written line-item estimate up front so the number you see is the number you pay. Call (833) 954-4985 for an exact quote – estimates are free.
All of it is covered by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right, and the material brands carry their own manufacturer warranties on top of that.
Homeowners planning a bigger change often pair this work with a Garage Conversion ADU in McKinney or a New Detached ADU in McKinney, and both start with the same kind of free on-site estimate.
Get a free estimate on your McKinney cabinets and countertops
Call (833) 954-4985 and a live person answers, day or night. We’ll set up a free on-site estimate, measure your kitchen, and put a written line-item quote in your hands, with no-hassle upfront pricing and 0% financing for 18 months available. If your project runs over $10,000, the $1,000 off promotion applies. Cabinets & Countertops in McKinney, priced before you commit. You can also see the neighborhoods we cover on our McKinney service-area page.