New Detached ADU in McKinney, TX: What It Costs and What It Takes
A detached ADU in McKinney usually runs $45,000 to $130,000 for a garage-conversion-scale unit and $90,000 to $220,000 for full new detached construction with its own kitchen, bath and utility service. Plan on six to ten months from the first design meeting to a final inspection, though McKinney permit review can stretch that. Call (833) 954-4985 to set up a free on-site estimate and we’ll walk your lot before you commit to anything.
How a New Detached ADU Gets Built in McKinney, Start to Finish

A new detached ADU is a small house on your lot. That’s the mental model that keeps expectations honest. It has its own foundation, its own roof, its own electrical service and its own inspection sequence. Here’s how the work actually unfolds.
Stage 1: Site walk and hard numbers (days 1-7)
We come out, measure the buildable footprint, check setbacks against your plat, and shoot grade so the foundation ties to your yard’s slope correctly. On McKinney’s clay, drainage direction matters more than the structure itself. You decide the unit size and whether it’s a studio, one-bedroom or two-bedroom layout. That single choice moves the whole budget by tens of thousands, so we lock it here, not later.
Stage 2: Design, engineering and permit submittal (weeks 2-10)
Plans get drawn, then stamped by a Texas engineer. The stamped set goes to the City of McKinney, and review can take anywhere from a few weeks to several months depending on your zoning category and lot. You’ll decide exterior finishes and roofline at this point so the ADU reads as a natural part of your property, not a shipping container dropped in the back.
Stage 3: Foundation and shell (weeks 6-14)
We excavate, form, place rebar, and pour the slab or set the pier-and-beam system your engineer specified. Post-tension slabs are standard on McKinney’s expansive clays. Then comes framing, sheathing, roofing and windows. Rough-in inspections for plumbing, electrical and mechanical happen before any wall goes closed. Budget about six to eight weeks of framed-and-dried work once the slab cures.
Stage 4: Systems, insulation and finish-out (weeks 12-24)
Now the trades stack: HVAC, plumbing trim, electrical panel and devices, drywall, then finishes. This is the long tail of the project, and where homeowners make hundreds of small decisions. Cabinets and countertops get ordered early because lead times run four to eight weeks on most lines. We give you a selection sheet with dates so nothing stalls waiting on a decision you didn’t know was due.
Stage 5: Inspections and final walkthrough (weeks 20-30)
The city runs final inspections on framing, electrical, plumbing, mechanical and the certificate of occupancy. We coordinate every one of those. Then we walk the unit with you, punch-list anything that’s off, and hand over warranties on the work. Most jobs finish inside the estimated window if materials arrive on schedule.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
For a detached ADU, the specification decisions that shape cost and how the unit lives fall into a handful of buckets. Here’s the honest version of each.
- Slab vs. pier-and-beam foundation: Post-tension slab is faster and cheaper on stable grade; pier-and-beam suits lots with heavy clay movement or drainage problems and costs more up front but tolerates movement better. On McKinney’s expanding clay, we default to slab unless the grading analysis says otherwise.
- Single-story vs. story-and-a-half: A single-story unit is easier to permit, cheaper per square foot and simpler for aging-in-place. A second level gains floor area without expanding the footprint, but the structural cost climbs and the roof complexity adds weeks.
- Full kitchen vs. kitchenette: A true kitchen needs its own utility service and venting, which adds real dollars. A kitchenette with a compact range and no disposal keeps the build simpler and often satisfies the “accessory dwelling” definition cleanly.
- Standalone service vs. off the main panel: A dedicated electrical service means the tenant pays their own utility bill, which most McKinney homeowners want. It costs more but simplifies long-term ownership.
- Roof shingles – Tamko or Boral: Standard architectural shingles (Tamko among the reliable mid-tier options) hit the value sweet spot. Boral steel or tile profiles deliver the historic-downtown look and much longer life at a premium.
- Windows – PGT or CGI: Both make impact-rated products that handle North Texas hail and summer heat gain. PGT’s impact line is the common upgrade; basic single-pane won’t meet modern energy codes for a new structure, so plan for rated units regardless.
Homeowners often pair a detached ADU project with Concrete Driveways & Concrete Work in McKinney so the renter or family member has their own parking and a code-compliant approach, or with Paver Driveways in McKinney when the aesthetic needs to match the main house.
What New Detached ADU Costs in McKinney, TX

Detached ADU construction in McKinney runs $90,000 to $220,000 depending on size, foundation method and system complexity. A more modest unit or a garage-adjacent build can land near $45,000 to $130,000 when you’re working from existing structure. Those ranges hold whether your lot sits in a new subdivision out west or a redeveloped parcel near downtown.
The variables that push the number up or down
- Unit size: Every added square foot carries foundation, framing, roofing and finish cost. A 500 sq ft studio sits at the low end; a 900-1,000 sq ft two-bedroom approaches the ceiling.
- Foundation condition and soil: A straightforward post-tension slab pour keeps cost down. If the grading analysis calls for deeper piers or drainage correction, add meaningful dollars.
- Utility runs from the house: The farther the ADU sits from your main panel and water meter, the more trenching and conduit you pay for. Trenching through established landscaping is slower than through bare ground.
- Relocating or upgrading the existing panel: If your main electrical service can’t carry an added load, an upgrade is a separate cost. Many McKinney homes in the 2000s tract subdivisions need that upgrade.
- Permit scope and historic review: New construction on vacant grade runs a standard review. Anything touching a contributing structure downtown adds Historic Preservation Advisory Board steps and time.
A written estimate from us itemizes foundation, framing, roofing, mechanical, electrical, plumbing, finishes and permits separately, with the assumption behind each line stated plainly. What it typically does not include: landscaping restoration, fencing, or site work your engineer flags during construction that wasn’t visible on the original grading. We tell you that up front rather than billing it as a surprise change order later.
See the difference
Before
After
Before
After
Before
AfterWhat McKinney Homes Specifically Do to This Job
McKinney splits into two very different construction realities, and the split decides how this job goes. Out on the northern and western edges, in the 75070 and 75071 ZIPs, you’re building behind tracts that went up fast in the 2000s and 2010s. Slabs there swell and shrink on expansive clay through the region’s wet-dry cycles, and a surprising number of custom subdivisions hit foundation concerns within 10 to 15 years. On a new detached ADU build we pour post-tension and grade the site so water runs away from both structures, which also protects the main house.
Over in the historic core, the 75069 blocks around McKinney’s downtown square, new builds and century-old homes sit literally side by side. A detached unit there frequently needs the Historic Preservation Advisory Board sign-off before exterior work starts, and that review can add weeks that simply don’t exist on a typical build out east. We plan the schedule around it from day one. If your project turns out to be part of a larger scope, our Home Additions & ADU in McKinney page covers the wider picture, and the Home Additions & ADU service hub covers the full lineup we handle for McKinney.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in McKinney

Expect six to ten months for a full new detached ADU, with permit review and material lead times the two biggest schedule swings. McKinney’s downtown historic review branch can add weeks; standard subdivision review moves faster. Call (833) 954-4985 and we’ll give you a realistic timeline once we’ve seen the lot.
Yes. A new detached ADU is new construction and requires a full building permit through the City of McKinney, with separate electrical, plumbing and mechanical inspections. If your property is in the historic district, exterior changes also require board approval. We pull the permits and coordinate every inspection, so that step lands on us, not you.
Usually yes, because a detached ADU sits on its own foundation with its own utilities. The connection points are the main panel and the water/sewer tap, and those are minor compared to the unit itself. A new dedicated electrical service keeps the two structures functionally independent. If your main panel can’t carry an added service, we’ll explain the upgrade in the estimate.
Full new detached construction lands between $90,000 and $220,000; a modest unit or one built against existing structure can run $45,000 to $130,000. Size, foundation method, utility distance from the house and finish grade are the levers that decide where your project lands. Call (833) 954-4985 for an exact line-item quote, and estimates are free.
Every ADU project we build is covered by our 730-Day Done Right Promise, and we back the work in writing for the full term. The unit also carries manufacturer warranties on roofing (Tamko or Boral), windows (PGT or CGI) and other installed systems, which we hand over at the final walkthrough. Any warranty claim is your live call to the team, not a voicemail box.
Get a Free Estimate for Your New Detached ADU in McKinney
Building a detached ADU is a five- to six-figure decision, and you deserve real numbers before you commit. Call (833) 954-4985 and a live person answers around the clock. We’ll schedule a free on-site estimate, measure your buildable footprint, talk through the size and layout that fits your budget, and leave you with a written line-item proposal. Our technicians bring up to 12 years of experience, arrive background-checked and in uniform, and every project carries our 730-Day Done Right Promise.