A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Murphy, TX

Garage Conversion ADU in Murphy - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What does a garage conversion ADU in Murphy, TX involve?

A garage conversion ADU in Murphy, TX turns an existing attached garage into a finished, self-contained living space – typically a studio or one-bedroom unit with its own entrance, kitchenette, and full bath. Most Murphy conversions run 10 to 16 weeks from permit to final inspection, and the realistic all-in range is $45,000 – $130,000 depending on whether you keep the existing slab and plumbing wall or move water and gas across the footprint. Call (833) 954-4985 to walk your garage with us and get a written line-item estimate – the number you see is the number you pay.

Call (833) 954-4985

How we run a garage conversion, stage by stage

A finished backyard cottage with a small covered porch

Garage conversions go wrong when the sequencing is treated like a remodel. It isn’t. A conversion adds a dwelling unit on your lot, which means life-safety items – egress, separation from the house, smoke and CO alarms, sometimes fire rating on the shared wall – get inspected before the finishes go in. Here’s the real order on a Murphy job.

Stage 1: Feasibility and layout (1 – 2 weeks). We measure the slab, check ceiling height against what a habitable room needs, and trace where your water heater, HVAC air handler, and electrical panel sit relative to the space you want. That last part decides a lot. In Murphy homes from the 1990s and 2000s, the garage wall is often where the panel and equipment land, so we plan around them rather than pretend they’ll move cheaply. You decide the unit type here: studio, one-bedroom, or a layout that can flex between the two.

Stage 2: Design and permitting (3 – 5 weeks). This is the stretch homeowners underestimate. We produce drawings, submit to the city, and answer plan-review comments. A garage door opening becomes a real exterior wall, so the drawings have to show how the new wall, insulation, and egress windows work together. You decide finish level and window placement at this stage, since both are locked once drawings are approved.

Stage 3: Demo and rough-in (2 – 3 weeks). Out go the garage door, tracks, and any shelving or storage loft that was framed in. We infill the door opening, frame interior partitions, and rough in plumbing, electrical, and HVAC. If your garage floor sits lower than the house, we bring it level with a topping pour – a common need on slab-on-grade Murphy homes where the driveway apron drops a few inches. Rough-in inspection happens before anything gets covered.

Stage 4: Insulation, drywall, and inspections (2 – 3 weeks). Closed-cell spray foam underside the new walls and ceiling is the usual call in North Texas, because a converted garage faces summer heat on three exterior sides. Drywall, tape, and texture follow, then the second round of inspections.

Stage 5: Finishes and final walkthrough (3 – 4 weeks). Flooring, kitchenette, bath fixtures, trim, paint, and the final inspection. You sign off against the same written scope we quoted from. Everything is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make on the unit

Most of the cost swing lives in five decisions. Here’s the honest trade-off on each.

  • Slab: keep or pour new. Keeping the existing slab is the single biggest savings – often $4,000 – $9,000. Pouring a fresh slab makes sense only if the old one has cracked through or the grades are wrong. On black-clay soil, hairline cracks are normal and not automatically disqualifying; movement that’s displaced the slab is.
  • Bathroom position. Tucking the bath against the existing plumbing wall keeps drain runs short. Pushing it to the far corner of the garage means breaking concrete and re-running drains – real money, and a longer permit scope.
  • Kitchenette level. A sink, under-counter fridge, and microwave is the value play. A full range and vent hood pulls in more gas and electrical work. KraftMaid and Wellborn cabinets both hold up well in a rental-grade unit; Cambria quartz is worth it in an owner-occupied unit, less so in one you’ll lease.
  • Exterior cladding. The new front wall needs to match the house. James Hardie siding is the usual choice on Murphy brick homes for the infill panel above and beside the old door opening.
  • HVAC approach. A dedicated mini-split is the simplest and most common. Tying into the house system works only if your existing unit has capacity to spare – and we test that rather than assume it.

What a garage conversion ADU costs in Murphy, TX

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 in Murphy. A studio with a kitchenette, kept on the existing slab and plumbing wall, lands near the bottom. A one-bedroom with a relocated bath, full kitchen, and upgraded finishes pushes toward the top.

  • Feasibility, design, and permitting: $3,500 – $9,000
  • Demo, infill, and framing: $6,000 – $15,000
  • Plumbing rough-in and bath: $7,000 – $22,000
  • Electrical and HVAC: $6,000 – $18,000
  • Insulation and drywall: $4,000 – $10,000
  • Kitchenette and finishes: $8,000 – $28,000
  • Flooring, trim, and paint: $5,000 – $14,000

Four variables move you up or down that band: whether the bath moves off the existing plumbing wall, whether the slab needs work, how far the electrical panel is from the new unit, and finish grade. A written estimate from us itemizes every one of those lines and states what’s excluded – permits, engineering, and any foundation repair we find once the slab is exposed. Home Additions & ADU in Murphy covers the wider project if the garage turns out to be the wrong footprint. Pricing is upfront with no change orders, and 0% financing for 18 months plus $1,000 off projects over $10,000 is available on a job this size.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why a Murphy garage conversion is its own kind of job

Murphy is nearly built out, and that shapes the work. New subdivision starts are rare here – most lots already have a house on them, so expansion happens by reworking what’s standing. That’s the local bread and butter, and it changes the permitting conversation: re-permitting existing footprint, keeping the new unit inside fence-line setback, and clearing HOA architectural review are as much of the job as the build. We’ve seen HOA submittals in Murphy add two to four weeks before the city sees a drawing, so we start that paperwork in parallel rather than after.

The housing stock is the second factor. Murphy homes are overwhelmingly 1990s-to-2000s brick veneer on slab-on-grade with engineered gable roofs. Those slabs sit on North Texas black clay that swells and shrinks through wet-dry cycles, so we check for movement before we commit to keeping the garage slab. The same soils shift door and window frames, which is why the new egress windows get framed for a little play rather than jammed tight. And the old garage door opening is where we see the most problems – openers and legacy hardware from the original build that are past their service life, plus infill panels that were never flashed right against hail and wind-driven rain. We correct that while the wall is open.

We cover the whole of Murphy, including the 75094 ZIP, and neighbors in Sachse, Wylie, Fairview, and Lucas call us for the same work. If the new driveway apron or a widened approach is part of your plan, homeowners often pair this with Concrete Driveways & Concrete Work in Murphy so the access and the unit go in on one schedule.

Serving Murphy, TX – Our Local Coverage Area

We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in Murphy

A new stained cedar privacy fence

Get a real number for your garage

A free on-site estimate starts with a walkthrough of your garage and the utility wall behind it. We measure the slab, trace the plumbing and panel, and talk through studio versus one-bedroom before anything is drawn. You leave that visit with a written, itemized estimate and a realistic schedule. No pressure on the call, no numbers pulled from the air. Call (833) 954-4985 to set it up, or see our full Home Additions & ADU scope if you’re weighing a conversion against other options.

Written by the team at Groundwork Construction Co.

Why Murphy Chooses Groundwork Construction Co. of Richardson

We set the standard for garage conversion ADU in Murphy.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Murphy

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Murphy Customers Say

Trusted by homeowners across Murphy and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in niche

More services in Murphy

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Murphy?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Murphy.

(833) 954-4985

Request a Free Estimate in Murphy

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch