Cabinets & Countertops in Murphy, TX: What the Job Actually Involves
Cabinets & countertops in Murphy, TX typically run $14,000 – $45,000 for a full tear-out and replacement, and a straightforward cabinet-and-top swap on an existing layout takes about two to three weeks from demo to final caulk. The work is a sequence, not a single install: demo and prep first, then cabinet set and leveling, then template, then stone fabrication, then the countertop set and backsplash. Call (833) 954-4985 and we’ll walk your kitchen and put real numbers in writing before anything gets ordered.
How the Cabinet and Countertop Job Runs, Stage by Stage

Most homeowners picture one crew showing up with boxes. In practice this is a five-stage job with a hard stop in the middle, because stone can’t be cut until the cabinets are set and level. Here’s the real order of operations.
Stage 1: Demo and site prep (1 – 2 days)
We pull the old doors and boxes, disconnect the sink and any gas line to the range, and protect the flooring. The homeowner decides here whether the old uppers get salvaged for the garage or hauled off. This is also when we open the wall behind the old cabinets to check for hidden water damage, which is common in Murphy’s 1990s homes where a slow supply-line drip has been running for years.
Stage 2: Layout confirmation and rough-in (1 – 3 days)
If you’re moving the sink, adding a dishwasher, or relocating the range, the plumbing and electrical rough-in happens now, before a single box goes in. This is the most expensive stage to skip and the most expensive one to add later. You’ll sign off on the final layout drawing before we cut anything.
Stage 3: Cabinet set and leveling (2 – 3 days)
Base cabinets go in first, shimmed and scribed to the wall. On a slab-on-grade Texas home, a floor that’s out of level by a quarter inch across ten feet is normal, and it has to be corrected before the tops are templated or the countertop will rock and the seams will open. Uppers follow, then the crown and light rail. This is where the quality gap between a good set and a great set shows up, and you’ll see it in the reveal lines at the ceiling.
Stage 4: Template and fabrication (5 – 10 business days)
A fabricator comes out with a digital template or physical jig, and the slab gets cut at the shop. Natural stone and quartz both need this gap. Laminate and some solid-surface tops can be ordered off measurements, which shortens the timeline. You’ll pick the edge profile and the sink cutout at the template, not before, so the fabricator can account for the actual cabinet run.
Stage 5: Countertop set and backsplash (1 – 2 days)
The tops drop in, seams get epoxied and color-matched, the sink and faucet connect, and the backsplash goes up. We finish with caulk at the wall and the final clean. Most jobs land in a single walkthrough at the end, and that walkthrough is where the 730-Day Done Right Promise gets explained in plain terms: if a door sags, a seam lifts, or a drawer pulls loose, we come back and fix it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between on a Murphy Kitchen
Every decision below moves the number and changes how the kitchen lives ten years from now. We’ll bring samples and honest trade-offs to the estimate.
- Cabinet boxes: frameless vs. framed. Frameless gives you more usable interior and a cleaner modern look, and it’s what most Murphy homeowners under 50 ask for. Framed cabinets are sturdier against a wall that’s out of plumb and read more traditional. Frameless costs slightly less per linear foot; framed holds up better in a house that’s settling.
- Door material: painted MDF vs. solid wood vs. thermofoil. Painted MDF is the value pick and looks great for a decade. Solid wood (maple, oak, alder) takes a refinish and survives kids and dogs. Thermofoil is the cheapest and the first to peel in a hot Texas kitchen. We stock KraftMaid lines because the finish warranty actually holds.
- Countertop surface: quartz vs. granite vs. laminate. Quartz is non-porous, needs no sealing, and handles the daily abuse of a family kitchen. Granite is natural, unique slab to slab, and needs resealing every year or two. Laminate is the budget answer and has improved, but it scorches and it can’t take an undermount sink without a substrate.
- Sink and edge details. An undermount sink with a solid-surface or stone top is the standard now. A farmhouse apron sink adds $600 – $1,200 in fabrication. A eased edge is included; a bullnose or ogee profile adds cost.
- Drawer and hardware upgrades. Soft-close and full-extension slides are worth the upgrade. Cheap slides fail first, and a drawer that won’t close is the number one callback on a cabinet job.
What Cabinets & Countertops Cost in Murphy, TX

Expect $14,000 – $45,000 for cabinets and countertops in Murphy, with the low end covering a modest 10×10 kitchen in stock-grade materials and the high end covering a large kitchen with custom cabinetry, quartz, and a relocated sink. Line-item ranges from our written estimates:
| Item | Typical Range |
|---|---|
| Cabinet installation (material + labor) | $4,000 – $13,000 |
| Countertop installation (material + fabrication) | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island (add or replace) | $3,000 – $10,000 |
What pushes a job to the high end
Four things. First, size: a 20-foot run of cabinets costs roughly twice a 10-foot run. Second, layout change: relocating the sink or range means plumbing and electrical rough-in, which adds $1,500 – $4,000. Third, material grade: a step up from stock to semi-custom cabinets or from laminate to quartz adds $5,000 – $12,000. Fourth, condition: an out-of-level floor or a hidden leak behind the old cabinets adds prep time we can’t see until demo.
What’s in the written estimate and what isn’t
Our estimate is line-item and fixed. It includes demo, haul-away, cabinet material and install, countertop fabrication and set, sink and faucet connection, and the final walkthrough. It does not include appliance purchases, new flooring under the cabinets, or structural work if we find a surprise. Anything that changes gets a written change order and your signature before we proceed, no surprises on the invoice.
See the difference
Before
After
Before
After
Before
AfterWhat Murphy Homes Specifically Do to This Job
Murphy is a nearly built-out Collin County suburb, and that changes this job in ways it wouldn’t in a newer town. Because most lots are already occupied, cabinet and countertop work here is almost always re-construction inside a standing 1990s-to-2000s brick-veneer home, not installation in a new build. Those homes share a set of quirks we’ve learned to plan for: the cabinet runs are often out of plumb by the time the house is 25 years old, the original thermofoil or builder-grade oak boxes are at the end of their life, and the slab-on-grade floor has usually moved a little with North Texas’ black-clay soils. We level before we template, not after, because a countertop cut to a crooked cabinet will rock and the seams will open within a season. If the scope grows into a full rework with layout changes, that pushes it into the territory of a Kitchen Remodeling in Murphy, and we’ll tell you honestly when that’s the better path. We also coordinate HOA architectural review where the neighborhood requires it, since a kitchen that faces the street or shows a vent through the exterior wall can trigger a review in Murphy’s planned communities. For homeowners taking on a wider scope, this often pairs with our broader Kitchen Remodeling service, or with projects like a Garage Conversion ADU in Murphy if the household is adding a separate living space in the same season. We cover Murphy and the surrounding Collin County towns, and we’ve done enough work in the 75094 ZIP to know what the original builder cabinets are hiding.
Serving Murphy, TX – Our Local Coverage Area
We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Murphy

Most jobs run two to three weeks from demo to final walkthrough, with the countertop template and fabrication accounting for five to ten business days of that time. The cabinet install itself is usually three to five days. Call (833) 954-4985 for a timeline based on your actual layout.
A like-for-like swap with no plumbing, electrical, or structural change usually doesn’t require a permit in Murphy. Moving a sink, adding an outlet, or removing a wall does, and we pull those permits and schedule the inspections as part of the job. We’ll tell you upfront which category your project falls into.
Yes, and most Murphy jobs we do are exactly that: new boxes in the same footprint, new tops, new sink and faucet. Keeping the plumbing where it is saves $1,500 – $4,000 and shortens the job by about a week. If the layout is working for you, this is the value path.
Expect $14,000 – $45,000 for the full job, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. The variables are size, material grade, layout changes, and what we find behind the old cabinets. Call (833) 954-4985 for an exact quote – estimates are free and line-item.
Every cabinet and countertop project is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If a door sags, a drawer fails, or a seam lifts inside that window, we come back and make it right. Call (833) 954-4985 to schedule your estimate.
Get a Written Cabinets & Countertops Estimate in Murphy
Call (833) 954-4985 for a free on-site estimate. We’ll measure the kitchen, open a cabinet door or two to see what’s behind the current boxes, show you the material options side by side, and leave you with a line-item quote in writing. No high-pressure close. Just the number, the timeline, and a plan you can actually hold us to.