A Groundwork company - serving Richardson, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · McKinney, TX

New Detached ADU in McKinney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Richardson
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in McKinney, TX: What It Costs and What It Takes

A detached ADU in McKinney usually runs $45,000 to $130,000 for a garage-conversion-scale unit and $90,000 to $220,000 for full new detached construction with its own kitchen, bath and utility service. Plan on six to ten months from the first design meeting to a final inspection, though McKinney permit review can stretch that. Call (833) 954-4985 to set up a free on-site estimate and we’ll walk your lot before you commit to anything.

Call (833) 954-4985

How a New Detached ADU Gets Built in McKinney, Start to Finish

A second-story addition that matches the existing roofline

A new detached ADU is a small house on your lot. That’s the mental model that keeps expectations honest. It has its own foundation, its own roof, its own electrical service and its own inspection sequence. Here’s how the work actually unfolds.

Stage 1: Site walk and hard numbers (days 1-7)

We come out, measure the buildable footprint, check setbacks against your plat, and shoot grade so the foundation ties to your yard’s slope correctly. On McKinney’s clay, drainage direction matters more than the structure itself. You decide the unit size and whether it’s a studio, one-bedroom or two-bedroom layout. That single choice moves the whole budget by tens of thousands, so we lock it here, not later.

Stage 2: Design, engineering and permit submittal (weeks 2-10)

Plans get drawn, then stamped by a Texas engineer. The stamped set goes to the City of McKinney, and review can take anywhere from a few weeks to several months depending on your zoning category and lot. You’ll decide exterior finishes and roofline at this point so the ADU reads as a natural part of your property, not a shipping container dropped in the back.

Stage 3: Foundation and shell (weeks 6-14)

We excavate, form, place rebar, and pour the slab or set the pier-and-beam system your engineer specified. Post-tension slabs are standard on McKinney’s expansive clays. Then comes framing, sheathing, roofing and windows. Rough-in inspections for plumbing, electrical and mechanical happen before any wall goes closed. Budget about six to eight weeks of framed-and-dried work once the slab cures.

Stage 4: Systems, insulation and finish-out (weeks 12-24)

Now the trades stack: HVAC, plumbing trim, electrical panel and devices, drywall, then finishes. This is the long tail of the project, and where homeowners make hundreds of small decisions. Cabinets and countertops get ordered early because lead times run four to eight weeks on most lines. We give you a selection sheet with dates so nothing stalls waiting on a decision you didn’t know was due.

Stage 5: Inspections and final walkthrough (weeks 20-30)

The city runs final inspections on framing, electrical, plumbing, mechanical and the certificate of occupancy. We coordinate every one of those. Then we walk the unit with you, punch-list anything that’s off, and hand over warranties on the work. Most jobs finish inside the estimated window if materials arrive on schedule.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Actually Choose Between

For a detached ADU, the specification decisions that shape cost and how the unit lives fall into a handful of buckets. Here’s the honest version of each.

  • Slab vs. pier-and-beam foundation: Post-tension slab is faster and cheaper on stable grade; pier-and-beam suits lots with heavy clay movement or drainage problems and costs more up front but tolerates movement better. On McKinney’s expanding clay, we default to slab unless the grading analysis says otherwise.
  • Single-story vs. story-and-a-half: A single-story unit is easier to permit, cheaper per square foot and simpler for aging-in-place. A second level gains floor area without expanding the footprint, but the structural cost climbs and the roof complexity adds weeks.
  • Full kitchen vs. kitchenette: A true kitchen needs its own utility service and venting, which adds real dollars. A kitchenette with a compact range and no disposal keeps the build simpler and often satisfies the “accessory dwelling” definition cleanly.
  • Standalone service vs. off the main panel: A dedicated electrical service means the tenant pays their own utility bill, which most McKinney homeowners want. It costs more but simplifies long-term ownership.
  • Roof shingles – Tamko or Boral: Standard architectural shingles (Tamko among the reliable mid-tier options) hit the value sweet spot. Boral steel or tile profiles deliver the historic-downtown look and much longer life at a premium.
  • Windows – PGT or CGI: Both make impact-rated products that handle North Texas hail and summer heat gain. PGT’s impact line is the common upgrade; basic single-pane won’t meet modern energy codes for a new structure, so plan for rated units regardless.

Homeowners often pair a detached ADU project with Concrete Driveways & Concrete Work in McKinney so the renter or family member has their own parking and a code-compliant approach, or with Paver Driveways in McKinney when the aesthetic needs to match the main house.

What New Detached ADU Costs in McKinney, TX

A framer checking new wall framing on a home addition

Detached ADU construction in McKinney runs $90,000 to $220,000 depending on size, foundation method and system complexity. A more modest unit or a garage-adjacent build can land near $45,000 to $130,000 when you’re working from existing structure. Those ranges hold whether your lot sits in a new subdivision out west or a redeveloped parcel near downtown.

The variables that push the number up or down

  • Unit size: Every added square foot carries foundation, framing, roofing and finish cost. A 500 sq ft studio sits at the low end; a 900-1,000 sq ft two-bedroom approaches the ceiling.
  • Foundation condition and soil: A straightforward post-tension slab pour keeps cost down. If the grading analysis calls for deeper piers or drainage correction, add meaningful dollars.
  • Utility runs from the house: The farther the ADU sits from your main panel and water meter, the more trenching and conduit you pay for. Trenching through established landscaping is slower than through bare ground.
  • Relocating or upgrading the existing panel: If your main electrical service can’t carry an added load, an upgrade is a separate cost. Many McKinney homes in the 2000s tract subdivisions need that upgrade.
  • Permit scope and historic review: New construction on vacant grade runs a standard review. Anything touching a contributing structure downtown adds Historic Preservation Advisory Board steps and time.

A written estimate from us itemizes foundation, framing, roofing, mechanical, electrical, plumbing, finishes and permits separately, with the assumption behind each line stated plainly. What it typically does not include: landscaping restoration, fencing, or site work your engineer flags during construction that wasn’t visible on the original grading. We tell you that up front rather than billing it as a surprise change order later.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What McKinney Homes Specifically Do to This Job

McKinney splits into two very different construction realities, and the split decides how this job goes. Out on the northern and western edges, in the 75070 and 75071 ZIPs, you’re building behind tracts that went up fast in the 2000s and 2010s. Slabs there swell and shrink on expansive clay through the region’s wet-dry cycles, and a surprising number of custom subdivisions hit foundation concerns within 10 to 15 years. On a new detached ADU build we pour post-tension and grade the site so water runs away from both structures, which also protects the main house.

Over in the historic core, the 75069 blocks around McKinney’s downtown square, new builds and century-old homes sit literally side by side. A detached unit there frequently needs the Historic Preservation Advisory Board sign-off before exterior work starts, and that review can add weeks that simply don’t exist on a typical build out east. We plan the schedule around it from day one. If your project turns out to be part of a larger scope, our Home Additions & ADU in McKinney page covers the wider picture, and the Home Additions & ADU service hub covers the full lineup we handle for McKinney.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in McKinney

A walk-in shower with large-format tile and a built-in niche

Get a Free Estimate for Your New Detached ADU in McKinney

Building a detached ADU is a five- to six-figure decision, and you deserve real numbers before you commit. Call (833) 954-4985 and a live person answers around the clock. We’ll schedule a free on-site estimate, measure your buildable footprint, talk through the size and layout that fits your budget, and leave you with a written line-item proposal. Our technicians bring up to 12 years of experience, arrive background-checked and in uniform, and every project carries our 730-Day Done Right Promise.

Written by the team at Groundwork Construction Co.

Why McKinney Chooses Groundwork Construction Co. of Richardson

We set the standard for new detached ADU in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Richardson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Richardson team

A local vetted partner works across Richardson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(833) 954-4985

Request a Free Estimate in McKinney

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch